Depending on the extent and type of remediation required, it is possible that some site features may be affected. For example, it may be less expensive to cap contaminated soils with concrete, leaving no room for landscaping or stormwater infiltration. This can have an effect on other site credits your project is attempting, such as SSc5.1: Protect or Restore Habitat and SSc6.1 and SSc6.2: Stormwater Management.
Project phase:
Credit tip type: