Consider space requirements and access. For PV, look for shadows, evaluate for optimal solar radiation and the angle of incidence during peak generating season. If possible, consider solar tracking system that follows the sun during the day and throughout the year. This would allow more electricity generated from the same area, though with more infrastructure cost. (See Resources.)
Project phase:
Credit tip type: