Compare measured flow with required levels of outdoor air for each ventilation zone. Calculate the required outdoor air levels by completing ventilation rate procedure (VRP) calculations using the provided ASHRAE 62MZCalcs spreadsheet for each air handling unit.
Credits:
Project phase:
Credit tip type: