Avoid costly changes to existing plans by addressing the credit requirements early in design. Typical changes often include adding supply silencers or return silencers; duct layout reworking; adding lined ducts or flexible ducts, diffusers, lined sound boots, double gypsum layers; or making classroom location changes. The need to make changes like these late in the game could be minimized or eliminated with early incorporation of acoustical goals.