Lifecycle Assessment Option 2, Path 4 "Salvaged Materials"

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Teeba Alja  on 

did anyone targeted Option 2, Path 4 and included recycled steel and rebars as "salvaged/reused"  materials.

0

Building reuse plus addition

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Erica Downs  on 

Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit?  Or only the existing building that is being resused?  I am finding th

4
Sustainability Director
Ayers Saint Gross
LEEDuser Basic Member
5 thumbs up
Wed Sep 18, 2024, 8:31 pm

Opt 2, path 4 Reuse and Salvaged Material requirement

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Dave Hubka  on 

I can't seem to find a minimum threshold for the amount of reused / salvaged materials required to be able to achieve all (4) points within Opt 2 Path 4.

5
Senior Benchmarking Specialist
Atelier Ten
LEEDuser Basic Member
1 thumbs up
Mon Feb 19, 2024, 1:24 pm

A2 EPDs Eutrophication

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Cecilia Lopez-Cotarelo  on 

Hello,

I am starting to use the new A2 type EPDs and having some challeneges with reporting the eutrophication potential, as there are three different types reported in different units:

2
Wed Aug 30, 2023, 7:08 am

Standard EPD to use in LCA

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Jose MARTINEZ  on 

Good afternoon colleagues, we have recently received comments (by LEED reviewers) about the EPDs we use for LCA in the baseline model that are not the standards to consider in the U.S.

0

Design stage of the submitted LCA analysis?

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by     on 

I couldn't find any mention of requirements for the design stage of the submitted LCA analysis.

1
Thu May 11, 2023, 7:01 pm

How to represent product-specific EPDs with LCA tools which don't cover them.

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by     on 

While we are getting up to speed on using OneClick LCA in our practice, most of our project LCAs are still in Tally, which currently has a more fixed database of materials.

1
Wed Jun 14, 2023, 4:07 pm

Defining a baseline building

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Cecilia Lopez-Cotarelo  on 

Hello,

I am carrying out an LCA for an EU-based project and am confused as to how to establish a baseline to compare improvements in the carbon footprint. 

1
Tue Jan 31, 2023, 3:40 pm
3
Tue Sep 27, 2022, 7:03 am
1
Tue Nov 8, 2022, 6:37 am

Updated Credit Requirements - resubmit or appeal?

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Deborah Lucking  on 

Wondering if anyone has experience with this - we submitted the Credit under the beta version of v4.1 in June 2021, not realizing that the April 2021 version of the Credit has lower thresholds.

4
Associate, Built Ecology
WSP USA
LEEDuser Expert
6 thumbs up
Tue May 31, 2022, 7:59 pm

Baseline - OK to use generic data and then show improvement with EPD?

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Linn Stolt  on 

Hello!

​I was wondering if it is allowed to use generic data for the Baseline and use EPD for the propsed building to show imporvements?

2
Global Technology Leader of Building Performance
Jacobs
LEEDuser Premium Member
3 thumbs up
Mon Mar 14, 2022, 9:23 am

Reused element in either structure or enclosure

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Maria Porter  on 

Option 2, path 4 – LCA. “….and incorporate reuse and/or salvage materials into the project’s structure and enclosure….”.

5
Senior Sustainability Consultant
Rambøll Denmark
LEEDuser Basic Member
0 thumbs up
Mon Mar 7, 2022, 8:45 am

Tool for LCA

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Martin Maribo  on 

Can the Danish tool, LCAbyg, for MR Credit: Building Life-Cycle Impact Reduction be used for a project in Denmark?

0

Option 2, Path 1

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Michelle Halle Stern  on 

Is Athena the only free LCA tool to use to get the 1 point whole building assessment?

1
Tue Mar 8, 2022, 7:09 pm
1
Tue Aug 31, 2021, 12:38 pm

Athena Structural Takeoff

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Monica Verastegui  on 

I am doing LCA analysis for LEED by Athena. the building is modeled in Revit and I am getting the takeoffs from the model. My question is regarding columns and beams calculation.

0
5
Default Avatar
Architectural Designer
Hellmuth + Bicknese Architects
LEEDuser Basic Member
0 thumbs up
Wed Aug 5, 2020, 5:49 am

Establishing "Baseline Building"

NC-v4.1 MRc1:Building Life-Cycle Impact Reduction
posted by  Kelsey Wotila  on 

Hi All,
My team and I are working through how to determine our baseline building for this credit.  The language reads:

1
Wed Jun 22, 2022, 9:43 pm