Credit achievement rate
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
- Daylight controls for daylit areas: (1 point) Install daylight responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights. Daylight controls must switch or dim electric lights in response to the presence or absence of daylight illumination in the space.1
- Daylight controls for 50% of the lighting load: (1 point) Install daylight responsive controls for 50% or more of the connected lighting load and demonstrate that 50% of the connected lighting load is daylight responsive. Daylight controls must switch or dim electric lights in response to the presence or absence of daylight illumination in the space.2
- Occupancy sensors: (1 point) Install occupancy sensors for 75% of the connected lighting load.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
Does decorative lighting need to be connected to daylight sensors?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What is included in the total connected lighting power?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Addenda
The project has an exterior canopy that wraps the building and projects 5\'-0" from the exterior glazing. The daylight responsive controls for our project will be installed within 10\' of the window glazing. In order to achieve this credit, do we need to install the controls 15\' from the edge of the exterior canopy or 15\' from the window glazing?
The project team is requesting clarification on the location of daylight responsive lighting controls to meet Credit EAc1.2 requirements. The credit requires that the controls be located within 15\' of the window glazing in all regularly occupied spaces. The exterior canopy provides shading for the glazing but is not considered as part of this dimension. Installing daylight control sensors within 10\' of the window glazing will meet this portion of credit requirements. Applicable Internationally.
Is there an adjusted point scale and minimum point threshold where applicable for LEED v2009 projects using ASHRAE 90.1-2010?
**July 1, 2016 update:This ruling has been revised to address the LEED 2009 minimum point requirement released 4/8/2016.**
Yes, LEED v2009 projects that demonstrate compliance using ASHRAE 90.1-2010 may utilize the adjusted point scale as shown in the Related Resource "ASHRAE 90.1-2010 Adjusted Point Scale for LEED v2009 Projects", subject to the following limitations:
• All mandatory provisions associated with ASHRAE 90.1-2010 (or an approved alternative standard) must be met in order for the project to use this compliance path.
• The ID+C thresholds shown are only relevant for projects using the Alternative Compliance Path described in LEED Interpretation 10412 that replaces the LEED 2009 requirements for EAp2, EAc1.1, EAc1.2, EAc1.3, and EAc1.4 with a Performance compliance path. All other ID&C projects would use the standard points available from EAc1.1 through EAc1.4 to comply with the 4-point minimum requirements.
• The CS 2009 EAp2-c1 ACP (http://www.usgbc.org/resources/cs-2009-eap2-c1-acp) may not be used in conjunction with this ASHRAE 90.1-2010 ACP. The project team must either use ASHRAE 90.1-2007 Appendix G with the CS 2009 EAp2-c1 ACP or use ASHRAE 90.1-2010 Appendix G without the CS 2009 EAp2-c1 ACP.
For projects that register on or after April 8th, 2016 and are subject to the mandatory Optimize Energy Performance point minimum:
If the project complies with all LEED v4 Minimum Energy Performance requirements for the relevant LEED v4 rating system, the project shall be considered to satisfy the LEED 2009 EA Prerequisite: Minimum Energy Performance mandatory minimum EAc1 points requirements (applicable for projects registered on or after April 8th, 2016), regardless of number of points achieved when applying this LEED Interpretation. The points documented under EAc1: Optimize Energy Performance shall be as shown in the ASHRAE 90.1-2010 Adjusted Points Scale for LEED v2009 for projects following the Performance Path, and zero for projects following a Prescriptive path.
This CIR is written to address the application of daylight responsive controls and the appropriate ways in which areas of a building can be excluded from this Credit. There are two rooms within the project that would be considered regularly occupied spaces, however the use of daylight responsive controls would not be appropriate. Both of these spaces do have exterior walls with windows and shades. The first space is a conference room, which will be used for a variety of meetings and presentations. The room will be equipped with AV equipment and therefore will require adjusting light levels accordingly. Therefore, the proposed design includes a complex dimming system with multiple schemes to allow for the necessary AV lighting level adjustment. The lights for the room will not operate when the room is vacant. One of the base lighting schemes will be set as the default scheme to operate once occupancy is sensed. We feel that the inclusion of daylight responsive controls would interfere with the occupant-chosen dimming schemes and is thus not appropriate in this room. The second space is a conference space/cafeteria. This space also has windows with operable shades and a line voltage dimmer. This is a large room that will be used for larger company meetings/presentations and for employee lunch and break purposes. The presence of daylight responsive controls would again interfere with the ability of the occupant to dim the space to their lighting needs. In summary: 1) We are requesting clarification on the definition of "regularly occupied spaces" within LEED-CI. 2) The intent of this CIR is to see areas such as the conference/cafeteria space described above would be an area acceptable to exclude from having daylight responsive controls. This is based on the ongoing potential for the daylight controls to interfere with the room\'s function. The lack of feasibility in conjunction with an occupant controlled dimmable system.
It is not acceptable to exclude the cafeteria and conference room spaces from the requirements of EAc1.2. The USGBC defines regularly occupied spaces as "areas where workers are seated or standing as they work inside a building." Both conference rooms and cafeterias fall under this description. In the "Design Approach for Daylight-Responsive Controls" section of the LEED-CI v2.0 Reference Guide description of EAc1.2, it is made clear that lighting control systems may have to deal with the combined logic of daylighting, occupancy sensors, and timed shut-off situations. Contemporary lighting systems are capable of handling both automated functions to reduce energy usage, and manual over-ride functions to allow for specific lighting level control, when needed. Applicable Internationally.
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
- Daylight controls for daylit areas: (1 point) Install daylight responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights. Daylight controls must switch or dim electric lights in response to the presence or absence of daylight illumination in the space.1
- Daylight controls for 50% of the lighting load: (1 point) Install daylight responsive controls for 50% or more of the connected lighting load and demonstrate that 50% of the connected lighting load is daylight responsive. Daylight controls must switch or dim electric lights in response to the presence or absence of daylight illumination in the space.2
- Occupancy sensors: (1 point) Install occupancy sensors for 75% of the connected lighting load.
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
Got the gist of EAc1.2 but not sure how to actually achieve it? LEEDuser gives step-by-step help. Premium members get:
- Checklists covering all the key action steps you'll need to earn the credit.
- Hot tips to give you shortcuts and avoid pitfalls.
- Cost tips to assess what a credit will actually cost, and how to make it affordable.
- Ideas for going beyond LEED with best practices.
- All checklists organized by project phase.
- On-the-fly suggestions of useful items from the Documentation Toolkit and Credit Language.
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.
Does decorative lighting need to be connected to daylight sensors?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What is included in the total connected lighting power?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
The project has an exterior canopy that wraps the building and projects 5\'-0" from the exterior glazing. The daylight responsive controls for our project will be installed within 10\' of the window glazing. In order to achieve this credit, do we need to install the controls 15\' from the edge of the exterior canopy or 15\' from the window glazing?
The project team is requesting clarification on the location of daylight responsive lighting controls to meet Credit EAc1.2 requirements. The credit requires that the controls be located within 15\' of the window glazing in all regularly occupied spaces. The exterior canopy provides shading for the glazing but is not considered as part of this dimension. Installing daylight control sensors within 10\' of the window glazing will meet this portion of credit requirements. Applicable Internationally.
Is there an adjusted point scale and minimum point threshold where applicable for LEED v2009 projects using ASHRAE 90.1-2010?
**July 1, 2016 update:This ruling has been revised to address the LEED 2009 minimum point requirement released 4/8/2016.**
Yes, LEED v2009 projects that demonstrate compliance using ASHRAE 90.1-2010 may utilize the adjusted point scale as shown in the Related Resource "ASHRAE 90.1-2010 Adjusted Point Scale for LEED v2009 Projects", subject to the following limitations:
• All mandatory provisions associated with ASHRAE 90.1-2010 (or an approved alternative standard) must be met in order for the project to use this compliance path.
• The ID+C thresholds shown are only relevant for projects using the Alternative Compliance Path described in LEED Interpretation 10412 that replaces the LEED 2009 requirements for EAp2, EAc1.1, EAc1.2, EAc1.3, and EAc1.4 with a Performance compliance path. All other ID&C projects would use the standard points available from EAc1.1 through EAc1.4 to comply with the 4-point minimum requirements.
• The CS 2009 EAp2-c1 ACP (http://www.usgbc.org/resources/cs-2009-eap2-c1-acp) may not be used in conjunction with this ASHRAE 90.1-2010 ACP. The project team must either use ASHRAE 90.1-2007 Appendix G with the CS 2009 EAp2-c1 ACP or use ASHRAE 90.1-2010 Appendix G without the CS 2009 EAp2-c1 ACP.
For projects that register on or after April 8th, 2016 and are subject to the mandatory Optimize Energy Performance point minimum:
If the project complies with all LEED v4 Minimum Energy Performance requirements for the relevant LEED v4 rating system, the project shall be considered to satisfy the LEED 2009 EA Prerequisite: Minimum Energy Performance mandatory minimum EAc1 points requirements (applicable for projects registered on or after April 8th, 2016), regardless of number of points achieved when applying this LEED Interpretation. The points documented under EAc1: Optimize Energy Performance shall be as shown in the ASHRAE 90.1-2010 Adjusted Points Scale for LEED v2009 for projects following the Performance Path, and zero for projects following a Prescriptive path.
This CIR is written to address the application of daylight responsive controls and the appropriate ways in which areas of a building can be excluded from this Credit. There are two rooms within the project that would be considered regularly occupied spaces, however the use of daylight responsive controls would not be appropriate. Both of these spaces do have exterior walls with windows and shades. The first space is a conference room, which will be used for a variety of meetings and presentations. The room will be equipped with AV equipment and therefore will require adjusting light levels accordingly. Therefore, the proposed design includes a complex dimming system with multiple schemes to allow for the necessary AV lighting level adjustment. The lights for the room will not operate when the room is vacant. One of the base lighting schemes will be set as the default scheme to operate once occupancy is sensed. We feel that the inclusion of daylight responsive controls would interfere with the occupant-chosen dimming schemes and is thus not appropriate in this room. The second space is a conference space/cafeteria. This space also has windows with operable shades and a line voltage dimmer. This is a large room that will be used for larger company meetings/presentations and for employee lunch and break purposes. The presence of daylight responsive controls would again interfere with the ability of the occupant to dim the space to their lighting needs. In summary: 1) We are requesting clarification on the definition of "regularly occupied spaces" within LEED-CI. 2) The intent of this CIR is to see areas such as the conference/cafeteria space described above would be an area acceptable to exclude from having daylight responsive controls. This is based on the ongoing potential for the daylight controls to interfere with the room\'s function. The lack of feasibility in conjunction with an occupant controlled dimmable system.
It is not acceptable to exclude the cafeteria and conference room spaces from the requirements of EAc1.2. The USGBC defines regularly occupied spaces as "areas where workers are seated or standing as they work inside a building." Both conference rooms and cafeterias fall under this description. In the "Design Approach for Daylight-Responsive Controls" section of the LEED-CI v2.0 Reference Guide description of EAc1.2, it is made clear that lighting control systems may have to deal with the combined logic of daylighting, occupancy sensors, and timed shut-off situations. Contemporary lighting systems are capable of handling both automated functions to reduce energy usage, and manual over-ride functions to allow for specific lighting level control, when needed. Applicable Internationally.