LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Choose 1 of the following options:
OPTION 1
Show that the building has previously been certified under LEED for New Construction and Major Renovations.OR
OPTION 2
Show that the building has been previously certified under LEED for Schools.OR
OPTION 3
Show that the building has previously been certified under LEED for Core & Shell Development. AND At least 75% of the floor area has also been certified under LEED for Commercial Interiors.OR
OPTION 4
Show that the building has been previously certified under LEED for Retail: New Construction and Major Renovations.OR
OPTION 5
Show that the building has been previously certified under LEED for Healthcare New Construction and Major Renovations.OR
OPTION 6
Show that the building has previously been certified under any version of LEED for Existing Buildings and that ongoing performance has been tracked during the entire recertification period (from initial certification until the recertification application).OR
OPTION 7
Show that the building has been previously certified under LEED for Homes. See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
"OR
OPTION 7
Show that the building has been previously certified under LEED for Homes."
The intent of SS-C1 is the selection of a sustainable and efficient performing building. LEED is identified as the rating system to confirm this. Our project is a Commercial Interiors project in Hong Kong. The local building rating system is Hong Kong Building Environmental Assessment Methodology (BEAM) and to our knowledge their are no LEED rated buildings. Our client has selected a building for their tenancy conforming to the highest BEAM rating(Platinum level) and has therefore demonstrated the selection of a sustainable and efficient performing building. Will a BEAM Platinum rated building meet the credit intent?
Your selection of a Platinum-rated BEAM rated building, while commendable, is not acceptable for achievement of this credit. Since there is no established equivalency between LEED and BEAM, your selection does not meet the intent of the credit. Applicable Internationally; China.
SS Credit 1 Option D: Heat Island Reduction, Non-Roof Intent: Reduce heat islands to minimize impact on habitat. Requirement: Locate the tenant space in a building where at least 30% of the site\'s non-roof impervious surfaces including parking areas, walkways, etc., uses light-colored/high-albedo materials with a Solar Reflectance Index (SRI) of at least 30. Situation: Tenant is municipal employees who will be located in the administrative area of a building that is part of a water treatment plant. There are two large circular in-ground water storage tanks that are a part of the water treatment process on the site. These tanks have permanent, impervious covers that have a durable coating with a high SRI value, and will be in place at the time of submittal for this project. Strategy under consideration: Consider the tanks to be a part of the site\'s non-roof impervious surfaces with an SRI index greater than 30, in order to provide the required percentage of light-colored, non-roof impervious surface area on the site (30%) needed to earn 1/2 point under Option D. Are we allowed to include the surface area of these tank covers in our calculation of the percentage of non-roof impervious surface area materials having SRI of 30 or higher?
The applicant is requesting clarification as to whether impervious covers to permanent in-ground equipment can be considered as non-roof impervious surfaces for the sake of meeting Option D requirements. Based on the description provided, it is assumed that the covers are exposed at or near grade, in which case the covers may be considered as non-roof impervious surface for the purpose of meeting this credit. All similar equipment covers within the scope of the project need to be consistently addressed.
Many of the ASTM Standards we reference have been withdrawn, upgraded, or superseded. Provide guidance on which updated standards should be used.
The withdrawn ASTM Standards listed- ASTM E1980-01 and ASTM E903-96- are still the correct references for SSc1: Site Selection, SSc7.1: Heat Island Effect, Non-Roof, and SSc7.2: Heat Island Effect-Roof. These two standards were not withdrawn for technical reasons, but were withdrawn because they had not been updated within 8 years. Testing can still be performed for these as well as the superseded standards. The updated versions of the superseded standards can be used, but are not required:Old: ASTM E408-71(1996), Current: E408-71(2008)Old: ASTM C1371-04a, Current: C1371-04a(2010)Old: ASTM E1918-97, Current: E1918-06 Old: ASTM C1549-04, Current: 1549-09Note: This Interpretations is also applicable to Sustainable Sites Credit 7.1: Heat Island Effect- Non-Roof and Sustainable Sites Credit 7.2: Roof, see LEED Interpretations dated 8/1/2011 ID number 10093 and 10092 respectively. Applicable Internationally.
Options G and H for landscape irrigation: This project is a commercial interiors project in a dense urban site. The existing project is on a site with no irrigation system and no landscaping. According to the LEED CI reference guide (3rd edition p. 55) states "...Also if the project site has no irrigation these points do not apply." However, the credit interpretation of 11/3/2005 for WE CR 1 (LEED NC), "Yes, projects that do not have landscaping may earn two points under WE Credits 1.1 and 1.2 since potable water is not being used for site irrigation. As the credit is about performance and not action taken by the project team, the intent of the credit in this situation is met." in addition, a CIR ruling from 7/29/06 about a different aspect of SS credit 1 for LEED CI stated that "To clarify, note that SS Credit 1 addresses the attributes of the building selected for the tenant space..." We believe that selecting a building that does not include a potable water irrigation system meets the intent of this point. Please advise whether we can expect to receive the two half-points (e.g. 1 point total) associated with Credit 1 options G and H for this project.
The applicant has inquired whether LEED-CI v2.0 credits SSc1 G and H are available for projects with no landscaping based on LEED-NC v2.1 CIR ruling dated 11/3/2005. The LEED-CIv2.0 reference guide states that "if the project site has no landscaping these points do not apply." This is intended to overrule the LEED-NC v2.1 CIR ruling dated 11/3/2005. Therefore, LEED-CI project sites with no landscaping cannot be awarded SSc1 G and H. Applicable Internationally.
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Choose 1 of the following options:
OPTION 1
Show that the building has previously been certified under LEED for New Construction and Major Renovations.OR
OPTION 2
Show that the building has been previously certified under LEED for Schools.OR
OPTION 3
Show that the building has previously been certified under LEED for Core & Shell Development. AND At least 75% of the floor area has also been certified under LEED for Commercial Interiors.OR
OPTION 4
Show that the building has been previously certified under LEED for Retail: New Construction and Major Renovations.OR
OPTION 5
Show that the building has been previously certified under LEED for Healthcare New Construction and Major Renovations.OR
OPTION 6
Show that the building has previously been certified under any version of LEED for Existing Buildings and that ongoing performance has been tracked during the entire recertification period (from initial certification until the recertification application).OR
OPTION 7
Show that the building has been previously certified under LEED for Homes.XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
Got the gist of SSc1 but not sure how to actually achieve it? LEEDuser gives step-by-step help. Premium members get:
- Checklists covering all the key action steps you'll need to earn the credit.
- Hot tips to give you shortcuts and avoid pitfalls.
- Cost tips to assess what a credit will actually cost, and how to make it affordable.
- Ideas for going beyond LEED with best practices.
- All checklists organized by project phase.
- On-the-fly suggestions of useful items from the Documentation Toolkit and Credit Language.
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.