LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.
Requirements
Meet the requirements of one of the options below:
Option 1. Fixture Shielding
Shield all exterior fixtures (where the sum of the mean lamp lumens for that fixture exceeds 2,500) such that the installed fixtures do not directly emit any light at a vertical angle more than 90 degrees from straight down. OR
Option 2. Perimeter Measurements
Measure the night illumination levels at regularly spaced points on the project boundary, taking the measurements with the building’s exterior and site lights both on and off. At least eight measurements are required, at a maximum spacing of 100 feet (30 meters) apart. The illumination level measured with the lights on must not be more than 20% above the level measured with the lights off.
See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
We have parking garage signs on the building exterior. We’re attempting Option 1 Fixture Shielding. Does the parking signage need to meet the requirements too? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What about lights on the roof? Do they have to comply? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What about exterior lighting owned by tenants? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
My building doesn’t have any exterior lighting (no site lighting and no building-mounted lighting). Is my project eligible for this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To increase night sky access, improve nighttime visibility, and reduce the consequences of development for wildlife and people.
Requirements
Meet the requirements of one of the options below:
Option 1. Fixture Shielding
Shield all exterior fixtures (where the sum of the mean lamp lumens for that fixture exceeds 2,500) such that the installed fixtures do not directly emit any light at a vertical angle more than 90 degrees from straight down. OR
Option 2. Perimeter Measurements
Measure the night illumination levels at regularly spaced points on the project boundary, taking the measurements with the building’s exterior and site lights both on and off. At least eight measurements are required, at a maximum spacing of 100 feet (30 meters) apart. The illumination level measured with the lights on must not be more than 20% above the level measured with the lights off.
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.
We have parking garage signs on the building exterior. We’re attempting Option 1 Fixture Shielding. Does the parking signage need to meet the requirements too? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What about lights on the roof? Do they have to comply? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What about exterior lighting owned by tenants? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
My building doesn’t have any exterior lighting (no site lighting and no building-mounted lighting). Is my project eligible for this credit? The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |