Log in
LEED v4
Data Centers – NC
Water Efficiency
Indoor water use reduction

LEED CREDIT

Data-Centers-NC-v4 WEc2: Indoor water use reduction 1-6 points

See all forum discussions about this credit »
View the LEED v4.1 version of this credit »

SPECIAL REPORT

LEEDuser expert

emily reese moody

LEED AP BD+C, LFA, EcoDistricts AP, ENV SP, Fitwel Ambassador, WEDG Professional, ActiveScore AP, GGP, GPCP, GCP

Jacobs
Sustainability Director, Certifications & Compliance

SPECIAL REPORT

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.

Table 1. Points for reducing water use
Percentage reduction Points (BD&C) Points (Schools, Retail, Hospitality, Healthcare) Points (ID&C) Points (CI Retail) Points (CI Hospitality)
25% 1 1 2 2 2
30% 2 2 4 4 4
35% 3 3 6 6 6
40% 4 4 8 8 8
45% 5 5 10 10 10
50% 6 -- 12 -- 11
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

Our plumbing fixtures are served, in part, by nonpotable water. How do we account for this?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

4/9/2021Updated: 4/8/2022
Reference Guide Correction
Description of change:
Under Step 2. Select Watersense-Labeled Products:
Delete "or showers" from the sentence "Newly installed aerators or flow restrictors added to private lavatories or showers must be WaterSense labeled.”

Campus Applicable
No
Internationally Applicable:
No
10/1/2014Updated: 12/3/2019
Reference Guide Correction
Description of change:
Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements" with: "Project outside the U.S. must meet WaterSense flush and flow rates."

In the related “International Water Labeling Programs” Guidance Document (http://www.usgbc.org/resources/international-water-labeling-programs), edit the note at the bottom of the document to read:
“Note: countries without a listed labeling program must meet the flush and flow requirements of “Table 6. Maximum installed flush or flow rates for prescriptive path” listed in the Step-by-Step Guidance section of the LEED Reference Guide.
Campus Applicable
No
Internationally Applicable:
Yes
7/25/2019Updated: 7/30/2019
Rating System Correction
Description of change:
Add an asterisk to the end of "private lavatory faucets" in the first column of the table.
Campus Applicable
No
Internationally Applicable:
No
4/6/2018Updated: 4/24/2018
Reference Guide Correction
Description of change:
Add the following content to the end of the "International Tips" section:

“Projects served by water supply pressures different than specified in LEED v4 may install pressure compensating aerators in flow fixtures to achieve the desired flow rate without compromising user satisfaction.”
Campus Applicable
No
Internationally Applicable:
Yes
4/6/2018Updated: 4/23/2018
Reference Guide Correction
Description of change:
ID+C reference guide, STEP-BY-STEP GUIDANCE section:

Under Step 4. Select High-Efficiency Appliances, add the following content after the sentence that begins "ENERGY STAR may not be readily available in all areas": "Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2. Standards for appliances"

Under Step 5. Design Process Water Systems, add the following content after the sentence that begins "Where applicable, select and design appliances and equipment": "Existing equipment intended for reuse in the project is not required to meet the requirements in Table 3. Standards for processes."

BD+C reference guide, STEP-BY-STEP GUIDANCE section:

Under Step 4. Select High-Efficiency Appliances, add the following content after the sentence that begins "Select appliances that meet the labeling or performance requirements":
"Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2. Standards for appliances"

Under Step 5. Design Process Water Systems, add the following content after the sentence that begins "Where applicable, select and design appliances and equipment": "Existing equipment intended for reuse in the project is not required to meet the requirements in Table 3. Standards for processes."
Campus Applicable
No
Internationally Applicable:
Yes
1/27/2017Updated: 10/12/2017
Reference Guide Correction
Description of change:
BD+C, ID+C reference guide: Revise the Group Approach section to read: "Eligible. The percentage reduction can be based on the total combined water use reduction in all LEED project buildings. If nonpotable water systems will be shared by multiple projects, ensure adequate supply to meet the demands of all projects using nonpotable water. The nonpotable water may not be double-counted among projects. Submit separate documentation for each building, as required for WE Prerequisite Indoor Water Use Reduction. "

O+M reference guide: Revise the Group Approach section to read: "Eligible. The percentage reduction can be based on the total combined water use reduction in all LEED project buildings. The baseline adjustment for year of substantial system completion should be averaged based on all plumbing fixtures in all buildings. If nonpotable water systems will be shared by multiple projects, ensure adequate supply to meet the demands of all projects using nonpotable water. The nonpotable water may not be double-counted among projects. Submit separate documentation for each building, as required for WE Prerequisite Indoor Water Use Reduction. "
Campus Applicable
Yes
Internationally Applicable:
Yes
1/27/2017Updated: 1/27/2017
Form Update
Description of change:
modified flow fixture calculation to allow for savings on total daily water use from non-default duration (v03)
Campus Applicable
No
Internationally Applicable:
No
4/5/2016Updated: 4/7/2016
Reference Guide Correction
Description of change:
Compliance Path 1. Prescriptive Achievement (Prerequisite Only), Step 2. Collect manufacturers’ information
Change the last sentence to read: “A plumbing fixture schedule is acceptable, provided it contains the fixture manufacturer, model, flush or flow rate information, and the WaterSense designation where applicable.”
Campus Applicable
Yes
Internationally Applicable:
Yes
4/5/2016Updated: 4/7/2016
Reference Guide Correction
Description of change:
Revise the second sentence to read: “If the spaces use different fixtures or have dramatically different patterns of occupancy or varying annual days of operation, complete the indoor water use calculator with a separate fixture group for each space type.”
Campus Applicable
Yes
Internationally Applicable:
Yes
7/1/2014Updated: 2/14/2015
Reference Guide Correction
Description of change:
Remove "seawater" from list of untreated water sources ineligible for this credit.
Add "treated seawater" to the list of acceptable alternative water sources, behind stormwater.
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Form Update
Description of change:
For CS projects only, added tenant lease agreement upload and narrative describing future tenant plumbing fixtures to WE Credit Indoor Water Use Reduction section. Throughout form, added instructional notes clarifying when field values should be based on developer-installed fixtures versus future tenant plumbing fixtures.
Campus Applicable
Yes
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Reference Guide Correction
Description of change:
Add Additions to Project Type Variations –

Additions
For credit compliance, include in the credit documentation all plumbing fixtures necessary to meet the occupants’ needs whether they will be installed as part of the project’s scope of work or not. Include at a minimum all necessary restroom fixtures (toilets, urinals, and lavatories) to meet the project occupants’ needs, and showers when seeking LT Credit Bicycle Facilities. The WaterSense label requirement does not apply to fixtures that are outside of the scope of the LEED project.
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Form Update
Description of change:
Fixed errors in previous version including uses per day calculation. Added override functions for special circumstances, modified built-in dual flush calculator, added custom naming of tabs and streamlined output fields

Added Neighborhood Development calculations
Campus Applicable
No
Internationally Applicable:
Yes
1/27/2017
LEED Interpretation
Inquiry:

Can automated-maintenance urinals be considered "waterless" for the purposes of WE prerequisite and credit Indoor Water Use Reduction?

Ruling:

Yes, automated maintenance urinals with water use not to exceed 150 gallons (568 liters) annually can be considered as waterless urinals for the purposes of credit achievement calculations in LEED v4 WE prerequisite and credit Indoor Water Use Reduction. Do not include the volume of water used by these urinals in the LEED v4 Indoor Water Use Calculator (they can be excluded, or considered to have a water use of 0 gallons/liters). Projects must also submit manufacturer documentation showing the annual volume of water used by the urinals.

Campus Applicable
Yes
Internationally Applicable:
Yes
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

LEEDuser expert

emily reese moody

LEED AP BD+C, LFA, EcoDistricts AP, ENV SP, Fitwel Ambassador, WEDG Professional, ActiveScore AP, GGP, GPCP, GCP

Jacobs
Sustainability Director, Certifications & Compliance

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Further reduce fixture and fitting water use from the calculated baseline in WE Prerequisite Indoor Water Use Reduction. Additional potable water savings can be earned above the prerequisite level using alternative water sources. Include fixtures and fittings necessary to meet the needs of the occupants. Some of these fittings and fixtures may be outside the tenant space (for Commercial Interiors) or project boundary (for New Construction). Points are awarded according to Table 1.

Table 1. Points for reducing water use
Percentage reduction Points (BD&C) Points (Schools, Retail, Hospitality, Healthcare) Points (ID&C) Points (CI Retail) Points (CI Hospitality)
25% 1 1 2 2 2
30% 2 2 4 4 4
35% 3 3 6 6 6
40% 4 4 8 8 8
45% 5 5 10 10 10
50% 6 -- 12 -- 11

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

Our plumbing fixtures are served, in part, by nonpotable water. How do we account for this?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

4/9/2021Updated: 4/8/2022
Reference Guide Correction
Description of change:
Under Step 2. Select Watersense-Labeled Products:
Delete "or showers" from the sentence "Newly installed aerators or flow restrictors added to private lavatories or showers must be WaterSense labeled.”

Campus Applicable
No
Internationally Applicable:
No
10/1/2014Updated: 12/3/2019
Reference Guide Correction
Description of change:
Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements" with: "Project outside the U.S. must meet WaterSense flush and flow rates."

In the related “International Water Labeling Programs” Guidance Document (http://www.usgbc.org/resources/international-water-labeling-programs), edit the note at the bottom of the document to read:
“Note: countries without a listed labeling program must meet the flush and flow requirements of “Table 6. Maximum installed flush or flow rates for prescriptive path” listed in the Step-by-Step Guidance section of the LEED Reference Guide.
Campus Applicable
No
Internationally Applicable:
Yes
7/25/2019Updated: 7/30/2019
Rating System Correction
Description of change:
Add an asterisk to the end of "private lavatory faucets" in the first column of the table.
Campus Applicable
No
Internationally Applicable:
No
4/6/2018Updated: 4/24/2018
Reference Guide Correction
Description of change:
Add the following content to the end of the "International Tips" section:

“Projects served by water supply pressures different than specified in LEED v4 may install pressure compensating aerators in flow fixtures to achieve the desired flow rate without compromising user satisfaction.”
Campus Applicable
No
Internationally Applicable:
Yes
4/6/2018Updated: 4/23/2018
Reference Guide Correction
Description of change:
ID+C reference guide, STEP-BY-STEP GUIDANCE section:

Under Step 4. Select High-Efficiency Appliances, add the following content after the sentence that begins "ENERGY STAR may not be readily available in all areas": "Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2. Standards for appliances"

Under Step 5. Design Process Water Systems, add the following content after the sentence that begins "Where applicable, select and design appliances and equipment": "Existing equipment intended for reuse in the project is not required to meet the requirements in Table 3. Standards for processes."

BD+C reference guide, STEP-BY-STEP GUIDANCE section:

Under Step 4. Select High-Efficiency Appliances, add the following content after the sentence that begins "Select appliances that meet the labeling or performance requirements":
"Existing appliances intended for reuse in the project are not required to meet the requirements in Table 2. Standards for appliances"

Under Step 5. Design Process Water Systems, add the following content after the sentence that begins "Where applicable, select and design appliances and equipment": "Existing equipment intended for reuse in the project is not required to meet the requirements in Table 3. Standards for processes."
Campus Applicable
No
Internationally Applicable:
Yes
1/27/2017Updated: 10/12/2017
Reference Guide Correction
Description of change:
BD+C, ID+C reference guide: Revise the Group Approach section to read: "Eligible. The percentage reduction can be based on the total combined water use reduction in all LEED project buildings. If nonpotable water systems will be shared by multiple projects, ensure adequate supply to meet the demands of all projects using nonpotable water. The nonpotable water may not be double-counted among projects. Submit separate documentation for each building, as required for WE Prerequisite Indoor Water Use Reduction. "

O+M reference guide: Revise the Group Approach section to read: "Eligible. The percentage reduction can be based on the total combined water use reduction in all LEED project buildings. The baseline adjustment for year of substantial system completion should be averaged based on all plumbing fixtures in all buildings. If nonpotable water systems will be shared by multiple projects, ensure adequate supply to meet the demands of all projects using nonpotable water. The nonpotable water may not be double-counted among projects. Submit separate documentation for each building, as required for WE Prerequisite Indoor Water Use Reduction. "
Campus Applicable
Yes
Internationally Applicable:
Yes
1/27/2017Updated: 1/27/2017
Form Update
Description of change:
modified flow fixture calculation to allow for savings on total daily water use from non-default duration (v03)
Campus Applicable
No
Internationally Applicable:
No
4/5/2016Updated: 4/7/2016
Reference Guide Correction
Description of change:
Compliance Path 1. Prescriptive Achievement (Prerequisite Only), Step 2. Collect manufacturers’ information
Change the last sentence to read: “A plumbing fixture schedule is acceptable, provided it contains the fixture manufacturer, model, flush or flow rate information, and the WaterSense designation where applicable.”
Campus Applicable
Yes
Internationally Applicable:
Yes
4/5/2016Updated: 4/7/2016
Reference Guide Correction
Description of change:
Revise the second sentence to read: “If the spaces use different fixtures or have dramatically different patterns of occupancy or varying annual days of operation, complete the indoor water use calculator with a separate fixture group for each space type.”
Campus Applicable
Yes
Internationally Applicable:
Yes
7/1/2014Updated: 2/14/2015
Reference Guide Correction
Description of change:
Remove "seawater" from list of untreated water sources ineligible for this credit.
Add "treated seawater" to the list of acceptable alternative water sources, behind stormwater.
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Form Update
Description of change:
For CS projects only, added tenant lease agreement upload and narrative describing future tenant plumbing fixtures to WE Credit Indoor Water Use Reduction section. Throughout form, added instructional notes clarifying when field values should be based on developer-installed fixtures versus future tenant plumbing fixtures.
Campus Applicable
Yes
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Reference Guide Correction
Description of change:
Add Additions to Project Type Variations –

Additions
For credit compliance, include in the credit documentation all plumbing fixtures necessary to meet the occupants’ needs whether they will be installed as part of the project’s scope of work or not. Include at a minimum all necessary restroom fixtures (toilets, urinals, and lavatories) to meet the project occupants’ needs, and showers when seeking LT Credit Bicycle Facilities. The WaterSense label requirement does not apply to fixtures that are outside of the scope of the LEED project.
Campus Applicable
No
Internationally Applicable:
Yes
10/1/2014Updated: 2/14/2015
Form Update
Description of change:
Fixed errors in previous version including uses per day calculation. Added override functions for special circumstances, modified built-in dual flush calculator, added custom naming of tabs and streamlined output fields

Added Neighborhood Development calculations
Campus Applicable
No
Internationally Applicable:
Yes
1/27/2017
LEED Interpretation
Inquiry:

Can automated-maintenance urinals be considered "waterless" for the purposes of WE prerequisite and credit Indoor Water Use Reduction?

Ruling:

Yes, automated maintenance urinals with water use not to exceed 150 gallons (568 liters) annually can be considered as waterless urinals for the purposes of credit achievement calculations in LEED v4 WE prerequisite and credit Indoor Water Use Reduction. Do not include the volume of water used by these urinals in the LEED v4 Indoor Water Use Calculator (they can be excluded, or considered to have a water use of 0 gallons/liters). Projects must also submit manufacturer documentation showing the annual volume of water used by the urinals.

Campus Applicable
Yes
Internationally Applicable:
Yes

LEEDuser expert

emily reese moody

LEED AP BD+C, LFA, EcoDistricts AP, ENV SP, Fitwel Ambassador, WEDG Professional, ActiveScore AP, GGP, GPCP, GCP

Jacobs
Sustainability Director, Certifications & Compliance

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about Data-Centers-NC-v4 WEc2 View the LEED v4.1 version of this credit