Credit achievement rate
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Achieve a direct line of sight to the outdoor environment via vision glazing between 30 inches and 90 inches (between 0.8 meters and 2.3 meters) above the finish floor for building occupants in 90% of all regularly occupied areas. Determine the area with a direct line of sight by totaling the regularly occupied floor area that meets the following criteria:
- In plan view, the area is within sight lines drawn from perimeter vision glazing.
- In section view, a direct sight line can be drawn from the area to perimeter vision glazing.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
We would like to submit a CIR to request a streamlined approach for the daylight documentation. We have the particular condition of an identical cluster of office buildings. In spite of having the same foot print, each building will be uniquely impacted by orientation variation and specific surrounding context condition. The intent is to fully document one building showing that the amount of light increases as you move up through the floor plates. Then to proceed to document the worst case scenario of each building (ground floor) or the level that is least exposed to solar access. If the worst case scenario passes, then we infer based on our test case that the upper floors of the building will pass as well. This will help us streamline not only the documentation process for so many buildings but also the review process. Is this an acceptable documentation method for this credit?
The project team is requesting whether a campus credit may be pursued for IEQc8.1. Daylight and Views: Daylight through a typical floor plan and worst case scenario daylight calculations.Yes, the typical floor plan and worst-case scenario daylight calculations may be used for the campus credit and applied to all buildings within the master site that have identical floor plans. The 2010 Application Guide for Multiple Buildings and On-Campus Projects identifies IEQc8.1 as an individual building credit and states that each building should pursue the credit individually. However, in the same way that a multi-story building may provide a single floor plan for each grouping of identical floors, if buildings within the Master Site are identical, the same documentation may be used for each identical building. Any of the calculation methods (simulation, prescriptive, measurement) may be used. Documentation for the campus credit and associated projects must demonstrate how the worst case scenario was determined and that the only difference in the buildings is the orientation on the site. The footprint, square footage and interior layout of the buildings must be identical. Applicable Internationally.
This Credit Interpretation Request is in reference to a 90,000 square foot office building, research laboratory and data center, which utilizes extensive internal vision glazing and open office design to visually connect most occupants to landscaped exteriors. Offices with internal vision glazing are typically occupied by individuals that occasionally require the privacy of a closed-door office, i.e. those with direct reports and those having access to confidential information. In order to maximize their views when not in need of privacy, reverse wound spring hinges will hold the office doors in the open position as a default. The doors can, of course, be shut manually when the occupant desires privacy. This is a similar situation to the CIR of 10/23/2006 where sliding wall panels were used in residential sleeping rooms. USGBC ruled that the Views calculations could be performed with the panels in the open position. We would like to calculate the views for each of these offices equipped with reverse wound hinges in the open position. For each office using doors equipped with reverse wound spring hinges, which default the doors to the open position, is it acceptable to calculate EQ c8.2 Views with doors in the open position?
Can open doors qualify as vision glazing for the purposes of this credit? Open doors do not meet the requirements of this credit to provide views to the outdoors. The intent of this credit is to provide a connection between indoor spaces and the outdoors through the introduction of daylight and views into the regularly occupied areas of the building. While the described design periodically provides limited views through office doors that default to open, this strategy does not guarantee views for the occupants. From the provided description it is unclear at to why vision glazing cannot be incorporated into these spaces to ensure quality views at all times (allowing for privacy needs with some form of shades or blinds). Applicable Internationally.
The LEED Reference Guide for Green Building Design and Construction, 2009 Edition and LEED Reference Guide for Green Interior Design and Construction, 2009 Edition indicate the following instructions for determining the direct line of sight in section view. "Using representative building sections, draw a line at 42 inches (typical seated eye height) across the section to establish eye height and any obstruction to the perimeter glazing, Draw one or more representative sight lines from a point at eye height in the regularly occupied space to the perimeter vision glazing."Is the direct line of sight drawn from the area to the perimeter vision glazing in section view required to be a horizontal line at 42 inches above the finished floor? Can the direct line of sight slope from 42 inches at the seated area to any location within the vision glazing?
To determine direct lines of sight in section, provide one or more representative sight lines from a point at eye height (42 inches) in the regularly occupied space to perimeter vision glazing between 30 inches and 90 inches above the finished floor of the building. The direct line of sight may be slope from 42 inches at the seated area to any unobstructed area of the vision glazing. The direct line of sight is not required to be horizontal at 42 inches only. Internationally Applicable.
Our office building client is considering raising their desk partitions to help with acoustics. Our team believes that acoustic quality is an important component of Indoor Environmental Quality, even though it is not directly addressed by LEED. Therefore we are trying to carefully balance this concern with LEED credit requirements. Raising the furniture partitions just 6-inches to 66-inches total will help significantly, according to a study performed by a professional acoustics consultant. The client is proposing to make the portion of the panel above 60-inches clear, so as not to intrude on the daylighting and views. Will this still allow the furniture panels to be excluded from the calculations for daylighting and views? A previous CIR cites TRANSLUCENT panels, and suggests that these would not be acceptable. Our client is considering clear panels.
Views through interior glazing may be counted under this credit. However the horizontal view requirement of the credit must still be demonstrated from the seated height average of 42 inches. Applicable Internationally.
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Achieve a direct line of sight to the outdoor environment via vision glazing between 30 inches and 90 inches (between 0.8 meters and 2.3 meters) above the finish floor for building occupants in 90% of all regularly occupied areas. Determine the area with a direct line of sight by totaling the regularly occupied floor area that meets the following criteria:
- In plan view, the area is within sight lines drawn from perimeter vision glazing.
- In section view, a direct sight line can be drawn from the area to perimeter vision glazing.
XX%
Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »
Got the gist of IEQc8.2 but not sure how to actually achieve it? LEEDuser gives step-by-step help. Premium members get:
- Checklists covering all the key action steps you'll need to earn the credit.
- Hot tips to give you shortcuts and avoid pitfalls.
- Cost tips to assess what a credit will actually cost, and how to make it affordable.
- Ideas for going beyond LEED with best practices.
- All checklists organized by project phase.
- On-the-fly suggestions of useful items from the Documentation Toolkit and Credit Language.
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
- Calculators to help assess credit compliance.
- Tracking spreadsheets for materials purchases.
- Spreadsheets and forms to give to subs and other team members.
- Guidance documents on arcane LEED issues.
- Sample templates to help guide your narratives and LEED Online submissions.
- Examples of actual submissions from certified LEED projects.