Log in
LEED v2009
Existing Building Operations
Energy and Atmosphere

Energy Efficiency Best Management Practices

LEED CREDIT

EBOM-2009 EAp1: Energy efficiency best management practices - planning, documentation and opportunity assessment Required

See all forum discussions about this credit »

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

LEEDuser expert

Dave Hubka

LEED Fellow

EUA
Practice Leader - Sustainability

LEEDuser’s viewpoint

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Document the current sequence of operations for the building. Develop a building operating plan that provides details on how the building is to be operated and maintained. The operating plan must include, at a minimum, an occupancy schedule, equipment run-time schedule, design set points for all HVAC equipment, and design lighting levels throughout the building. Identify any changes in schedules or set points for different seasons, days of the week and times of day. Validate that the operating plan has been met during the performance period. Develop a systems narrative that briefly describes the mechanical and electrical systems and equipment in the building. The systems narrative must include all the systems used to meet the operating conditions stated in the operating plan, including at a minimum, heating, cooling, ventilation, lighting and any building controls systems. Create a narrative of the preventive maintenance plan for equipment described in the systems narrative and document the preventive maintenance schedule during the performance period. Conduct an energy audit that meets the requirements of the ASHRAE Level I walk-through assessment. [Europe ACP: EN 16247]

Alternative Compliance Paths (ACPs)

[view:embed_resource=page_1=4649824]
Credit substitution available
You may use the LEED v4 version of this credit on v2009 projects. For more information check out this article.
Pilot Alternative Compliance Path Available
This credit has an alternative compliance path available for the use of ISO 50001: Energy Management Systems. For more information see Pilot ACP 86: LEED 2009 EBOM ACPs for ISO 50001. [view:embed_resource=page_1=4649821]
Pilot Alternative Compliance Path Available
This credit has an alternative compliance path available for the use of ISO 50001: Energy Management Systems. For more information see Pilot ACP 86: LEED 2009 EBOM ACPs for ISO 50001. [view:embed_resource=page_1=4649821]
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

Frequently asked questions

How do you generate the annual energy use breakdown by end-use?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

What’s the difference between demand and consumption, in terms of energy costs and energy cost savings?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Who can perform the ASHRAE Level I audit? Can it be done in-house?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

To what degree is it necessary to follow the ASHRAE Procedures document? Is this provided as a general, optional guide, or must it be followed precisely, using the ASHRAE forms and completing the audit using the ASHRAE methodology?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How is the target EUI established?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

Credit achievement rate

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

LEEDuser expert

Dave Hubka

LEED Fellow

EUA
Practice Leader - Sustainability

Get the inside scoop

Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Document the current sequence of operations for the building. Develop a building operating plan that provides details on how the building is to be operated and maintained. The operating plan must include, at a minimum, an occupancy schedule, equipment run-time schedule, design set points for all HVAC equipment, and design lighting levels throughout the building. Identify any changes in schedules or set points for different seasons, days of the week and times of day. Validate that the operating plan has been met during the performance period. Develop a systems narrative that briefly describes the mechanical and electrical systems and equipment in the building. The systems narrative must include all the systems used to meet the operating conditions stated in the operating plan, including at a minimum, heating, cooling, ventilation, lighting and any building controls systems. Create a narrative of the preventive maintenance plan for equipment described in the systems narrative and document the preventive maintenance schedule during the performance period. Conduct an energy audit that meets the requirements of the ASHRAE Level I walk-through assessment. [Europe ACP: EN 16247]

Alternative Compliance Paths (ACPs)

[view:embed_resource=page_1=4649824]
Credit substitution available
You may use the LEED v4 version of this credit on v2009 projects. For more information check out this article.
Pilot Alternative Compliance Path Available
This credit has an alternative compliance path available for the use of ISO 50001: Energy Management Systems. For more information see Pilot ACP 86: LEED 2009 EBOM ACPs for ISO 50001. [view:embed_resource=page_1=4649821]
Pilot Alternative Compliance Path Available
This credit has an alternative compliance path available for the use of ISO 50001: Energy Management Systems. For more information see Pilot ACP 86: LEED 2009 EBOM ACPs for ISO 50001. [view:embed_resource=page_1=4649821]

XX%

Upgrade to LEEDuser Premium to see how many projects achieved this credit. Try it free »

Got the gist of EAp1 but not sure how to actually achieve it? LEEDuser gives step-by-step help. Premium members get:

  • Checklists covering all the key action steps you'll need to earn the credit.
  • Hot tips to give you shortcuts and avoid pitfalls.
  • Cost tips to assess what a credit will actually cost, and how to make it affordable.
  • Ideas for going beyond LEED with best practices.
  • All checklists organized by project phase.
  • On-the-fly suggestions of useful items from the Documentation Toolkit and Credit Language.

In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:

  • Calculators to help assess credit compliance.
  • Tracking spreadsheets for materials purchases.
  • Spreadsheets and forms to give to subs and other team members.
  • Guidance documents on arcane LEED issues.
  • Sample templates to help guide your narratives and LEED Online submissions.
  • Examples of actual submissions from certified LEED projects.

How do you generate the annual energy use breakdown by end-use?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

What’s the difference between demand and consumption, in terms of energy costs and energy cost savings?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Who can perform the ASHRAE Level I audit? Can it be done in-house?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

To what degree is it necessary to follow the ASHRAE Procedures document? Is this provided as a general, optional guide, or must it be followed precisely, using the ASHRAE forms and completing the audit using the ASHRAE methodology?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How is the target EUI established?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

LEEDuser expert

Dave Hubka

LEED Fellow

EUA
Practice Leader - Sustainability

See all LEEDuser forum discussions about this credit » Subscribe to new discussions about EBOM-2009 EAp1