LEED v4.1
New Construction
Materials and Resources
Construction and Demolition Waste Management Planning

NC-v4.1 MR103: Construction and Demolition Waste Management Planning

LEEDuser overview

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

08/11/2019– Updated: 08/11/2019
Form Update
Description of change:
v4.1 C&D Waste Calculator

C&D Waste calculator published

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
25/07/2019– Updated: 30/07/2019
Reference Guide Correction
Description of change:
100002311 C&D waste clarification for counting commingled as one or more material streams

Edit the fourth paragraph under "Commingled, source separated and counting materials streams" section to read as follows:

"All recycling facilities must be regulated by a local or state authority. Note that regulatory authorities often do not regulate recycling rates of facilities. To determine the mixed waste processing facility recycling rate, projects must use an average diversion rate for the facility that generally corresponds to the time materials were generated on the project and sent to the facility. The average recycling rate for the facility must exclude ADC. Mixed recyclable materials that are processed mechanically over the same recycling line are counted as one “stream” in LEED, even if the processing facility separates the output into multiple materials for recovery after processing."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

See all forum discussions about this credit »

Addenda

08/11/2019– Updated: 08/11/2019
Form Update
Description of change:
v4.1 C&D Waste Calculator

C&D Waste calculator published

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
25/07/2019– Updated: 30/07/2019
Reference Guide Correction
Description of change:
100002311 C&D waste clarification for counting commingled as one or more material streams

Edit the fourth paragraph under "Commingled, source separated and counting materials streams" section to read as follows:

"All recycling facilities must be regulated by a local or state authority. Note that regulatory authorities often do not regulate recycling rates of facilities. To determine the mixed waste processing facility recycling rate, projects must use an average diversion rate for the facility that generally corresponds to the time materials were generated on the project and sent to the facility. The average recycling rate for the facility must exclude ADC. Mixed recyclable materials that are processed mechanically over the same recycling line are counted as one “stream” in LEED, even if the processing facility separates the output into multiple materials for recovery after processing."

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »