LEEDuser’s viewpoint
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To reduce energy consumption by ensuring that heating and cooling systems operate at peak efficiency.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.
Requirements
Have all heating, cooling, and ventilation systems commissioned by a technician with North American Technician Excellence certification, HVAC contractor credentialed by an EPA-recognized HVAC Quality Installation Training and Oversight Organization (H-QUITO) (or equivalent as defined by USGBC). The technician must complete the ENERGY STAR for Homes, version 3, HVAC system quality installation contractor checklist, or equivalent as defined by USGBC.
General Pilot Documentation Requirements
- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Credit specific:
- Completed HVAC installer checklist, and list installer’s name, company, and credential
Additional questions:
- Was it challenging to find an qualified installer?
- Did the HVAC installer charge the project extra to complete the checklists? If yes, how much?
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To reduce energy consumption by ensuring that heating and cooling systems operate at peak efficiency.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.
Requirements
Have all heating, cooling, and ventilation systems commissioned by a technician with North American Technician Excellence certification, HVAC contractor credentialed by an EPA-recognized HVAC Quality Installation Training and Oversight Organization (H-QUITO) (or equivalent as defined by USGBC). The technician must complete the ENERGY STAR for Homes, version 3, HVAC system quality installation contractor checklist, or equivalent as defined by USGBC.
General Pilot Documentation Requirements
- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Credit specific:
- Completed HVAC installer checklist, and list installer’s name, company, and credential
Additional questions:
- Was it challenging to find an qualified installer?
- Did the HVAC installer charge the project extra to complete the checklists? If yes, how much?
LEED for Homes Review Process
LEED for Homes projects: When complete, submit documentation here.