LEEDuser’s viewpoint
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To minimize the obstruction of sunlight and contamination of air by the built environment for both the vegetation and occupants in public parks and green spaces surrounding the project.
Requirements
Preserve Sunlight and Fresh Air to Surrounding Public Parks and Green Space Demonstrate through computer modeling that the annual sun hours in the darkest occupiable location of the surrounding affected public parks or green spaces achieved by the proposed envelope is at least 3 times the hours in same location under the baseline case. Ensure that no building exhaust terminations and openings face directly towards the surrounding public parks or green spaces. Additionally, given the building height above the public assembly or green space and the width of the surrounding affected public assembly or green space, exceed the baseline average daily hours of full sun obtained at the level of the public space for the applicable height/width category as per table 1 below.
Building height as a function of public space width | Average hours of full sun obtained at public space level (per day) | |||||||
---|---|---|---|---|---|---|---|---|
0.5x | Width | ≥ | Height | 1.0x | Width | 2h | 36m | |
1.0x | Width | ≥ | Height | 2.0x | Width | 1h | 10m | |
2.0x | Width | ≥ | Height | 2.5x | Width | 1h | 00m | |
2.5x | Width | ≥ | Height | 3.0x | Width | 0h | 47m | |
3.0x | Width | ≥ | Height | 4.0x | Width | 0h | 41m | |
4.0x | Width | ≥ | Height | 5.0x | Width | 0h | 34m | |
5.0x | Width | ≥ | Height | 6.0x | Width | 0h | 30m | |
6.0x | Width | ≥ | Height | 0h | 27m |
Table 1 – Baseline Average Daily Hours of Full Sun
The surrounding affected public park, assembly space or green space is defined as any exterior vegetated area and its associated circulation paths that are located inside the longest shadow cast by the baseline building during the local growing season. The exterior vegetated area and its associated circulation paths must at least be partially accessible to the public to qualify for this credit. The darkest occupiable location is defined as the space within surrounding affected public park, assembly space or green space (public or not public) which receives the least amount of annual sun-hours.. The proposed building’s geographic location, envelope and massing in the daylight model shall be identical to those of the project building. The baseline building’s geographic location in the daylight model shall be identical to those of the project building. The baseline building’s massing and envelope in the daylight model shall be as follows depending on local zoning ordinances of the project site: Projects must meet the following criteria to be eligible for this credit:- Project must be close enough (or directly adjacent) to an existing public or non-public green space so that a portion of the regularly occupied public park, assembly space or other green space area falls within the shadow created by the proposed building.
- Proposed project site must have a net FAR ≥ 3.
- Project must achieve the following:
- v2009 SSc2 – Development Density and Community Connectivity AND v2009 SSc4.1 – Alternative Transportation – Public Transportation, or
- 2 points under v4 LTc Surrounding Density and Diverse Uses, Option 1. Surrounding Density AND v4 LTc Access to Quality Transit
- The edge of the envelope shall be along the edge of the largest contiguous development area within the LEED Boundary (including both the project building footprint, and any hardscape areas).
- Building setbacks as per local zoning regulations must be followed throughout.
- The massing shall be of a standard rectangular shape such that total floor area remains identical to the building footprint for every floor (including the roof)
- The height shall be such that the maximum allowable FAR (floor-area-ratio) as per local zoning regulations is achieved.
- The edge of the envelope shall be along the edge of the largest contiguous development area within the LEED Boundary (including both the project building footprint, and any hardscape areas). The building footprint cannot be larger than double the area of the proposed building footprint.
- The massing shall be of a standard rectangular shape such that total floor area remains identical to the building footprint for every floor (including the roof).
- The height shall be such that total interior area of the baseline building is equal to the total interior area of the proposed building.
Submittals
General
- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Required Documentation
Documentation | Project with local zoning requirements | Project without local zoning requirements |
---|---|---|
Dated documentation demonstrating that the sunlight on the site was studied and that the proposed building was altered during early stage design to meet credit requirements.
The documentation can be one of the following:
|
X | X |
Site plan of the project showing the LEED Boundary and the baseline building envelope | X | X |
Land survey or satellite image identifying both the project site and the surrounding public assembly, park or green area that is affected by the longest shadow cast by the project building during the local growing season | X | X |
Daylight simulation sun-hours results for the baseline building | X | X |
Daylight simulation sun-hours results for the proposed building demonstrating the increase in sun-hours | X | X |
Land survey or satellite image showing the space width of the surrounding affected public parks or green spaces and elevations of the project demonstrating the full building height above the affected public parks or green spaces | X | X |
Summary or excerpts of applicable local zoning regulations | X | |
Narrative to addresses how the project’s proposed building design favorably compares to the code required setbacks | X | |
Mechanical floor plans demonstrating that no exhaust openings directly face any adjacent green space or public parks. | X | X |
Changes
- 10/13/2017 - original publication
- Closed for registration on 8/12/2022
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To minimize the obstruction of sunlight and contamination of air by the built environment for both the vegetation and occupants in public parks and green spaces surrounding the project.
Requirements
Preserve Sunlight and Fresh Air to Surrounding Public Parks and Green Space Demonstrate through computer modeling that the annual sun hours in the darkest occupiable location of the surrounding affected public parks or green spaces achieved by the proposed envelope is at least 3 times the hours in same location under the baseline case. Ensure that no building exhaust terminations and openings face directly towards the surrounding public parks or green spaces. Additionally, given the building height above the public assembly or green space and the width of the surrounding affected public assembly or green space, exceed the baseline average daily hours of full sun obtained at the level of the public space for the applicable height/width category as per table 1 below.
Building height as a function of public space width | Average hours of full sun obtained at public space level (per day) | |||||||
---|---|---|---|---|---|---|---|---|
0.5x | Width | ≥ | Height | 1.0x | Width | 2h | 36m | |
1.0x | Width | ≥ | Height | 2.0x | Width | 1h | 10m | |
2.0x | Width | ≥ | Height | 2.5x | Width | 1h | 00m | |
2.5x | Width | ≥ | Height | 3.0x | Width | 0h | 47m | |
3.0x | Width | ≥ | Height | 4.0x | Width | 0h | 41m | |
4.0x | Width | ≥ | Height | 5.0x | Width | 0h | 34m | |
5.0x | Width | ≥ | Height | 6.0x | Width | 0h | 30m | |
6.0x | Width | ≥ | Height | 0h | 27m |
Table 1 – Baseline Average Daily Hours of Full Sun
The surrounding affected public park, assembly space or green space is defined as any exterior vegetated area and its associated circulation paths that are located inside the longest shadow cast by the baseline building during the local growing season. The exterior vegetated area and its associated circulation paths must at least be partially accessible to the public to qualify for this credit. The darkest occupiable location is defined as the space within surrounding affected public park, assembly space or green space (public or not public) which receives the least amount of annual sun-hours.. The proposed building’s geographic location, envelope and massing in the daylight model shall be identical to those of the project building. The baseline building’s geographic location in the daylight model shall be identical to those of the project building. The baseline building’s massing and envelope in the daylight model shall be as follows depending on local zoning ordinances of the project site: Projects must meet the following criteria to be eligible for this credit:- Project must be close enough (or directly adjacent) to an existing public or non-public green space so that a portion of the regularly occupied public park, assembly space or other green space area falls within the shadow created by the proposed building.
- Proposed project site must have a net FAR ≥ 3.
- Project must achieve the following:
- v2009 SSc2 – Development Density and Community Connectivity AND v2009 SSc4.1 – Alternative Transportation – Public Transportation, or
- 2 points under v4 LTc Surrounding Density and Diverse Uses, Option 1. Surrounding Density AND v4 LTc Access to Quality Transit
- The edge of the envelope shall be along the edge of the largest contiguous development area within the LEED Boundary (including both the project building footprint, and any hardscape areas).
- Building setbacks as per local zoning regulations must be followed throughout.
- The massing shall be of a standard rectangular shape such that total floor area remains identical to the building footprint for every floor (including the roof)
- The height shall be such that the maximum allowable FAR (floor-area-ratio) as per local zoning regulations is achieved.
- The edge of the envelope shall be along the edge of the largest contiguous development area within the LEED Boundary (including both the project building footprint, and any hardscape areas). The building footprint cannot be larger than double the area of the proposed building footprint.
- The massing shall be of a standard rectangular shape such that total floor area remains identical to the building footprint for every floor (including the roof).
- The height shall be such that total interior area of the baseline building is equal to the total interior area of the proposed building.
Submittals
General
- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Required Documentation
Documentation | Project with local zoning requirements | Project without local zoning requirements |
---|---|---|
Dated documentation demonstrating that the sunlight on the site was studied and that the proposed building was altered during early stage design to meet credit requirements.
The documentation can be one of the following:
|
X | X |
Site plan of the project showing the LEED Boundary and the baseline building envelope | X | X |
Land survey or satellite image identifying both the project site and the surrounding public assembly, park or green area that is affected by the longest shadow cast by the project building during the local growing season | X | X |
Daylight simulation sun-hours results for the baseline building | X | X |
Daylight simulation sun-hours results for the proposed building demonstrating the increase in sun-hours | X | X |
Land survey or satellite image showing the space width of the surrounding affected public parks or green spaces and elevations of the project demonstrating the full building height above the affected public parks or green spaces | X | X |
Summary or excerpts of applicable local zoning regulations | X | |
Narrative to addresses how the project’s proposed building design favorably compares to the code required setbacks | X | |
Mechanical floor plans demonstrating that no exhaust openings directly face any adjacent green space or public parks. | X | X |
Changes
- 10/13/2017 - original publication
- Closed for registration on 8/12/2022