Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To provide for the ongoing accountability of building energy consumption over time.
Requirements
Whole building design and construction projects must use actual and predicted wholebuilding energy consumption to meet the requirements below. Core and shell design and construction projects must use actual and predicted basebuilding energy consumption to meet the requirements below. Develop and implement a Measurement & Verification (M&V) program in accordance with Option D: Calibrated Simulation (either Savings Estimation Method 1 or 2), as specified by the International Performance Measurement and Verification Protocol (IPMVP), Concepts and Options for Determining Energy Savings in New Construction, Volume III, 2006. The M&V period must cover at least one year of post-construction occupancy. An executed contract(s) must be in place for all services necessary to execute the M&V program, including the eventual submittal of the final M&V report to the project team and building owner, including
- Reconciliation between actual energy use and energy use predicted by EA Credit 1.
- Discussion of reconciliation and variances between actual energy use and energy use predicted by EA Credit 1.
- Actual avoided energy use compared to the EA Credit 1 baseline.
- Avoided energy costs compared to the EA Credit 1 baseline.
- Avoided GHG emissions compared to the EA Credit 1 baseline.
- Recommendations for any remedial or future action.
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Credit specific
Note: As the pilot continues, requirements and submittal requirements will evolve. Please submit any additional documentation that you believe would be helpful in supporting your claims. This feedback will assist in future credit revisions. All Projects:- Complete the Google Form as submittal for this credit. AND
- Upload. Provide a copy of the contract(s) in place for all services necessary to execute the M&V program.
- Upload. Provide a copy of the M&V Plan consistent with Option D: Calibrated Simulation in IPMVP Volume III, 2006.
Additional Questions
- Were there barriers to implementing the strategies used under this credit?
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
Pilot Credit Closed
This pilot credit is closed to new registrations
To provide for the ongoing accountability of building energy consumption over time.
Requirements
Whole building design and construction projects must use actual and predicted wholebuilding energy consumption to meet the requirements below. Core and shell design and construction projects must use actual and predicted basebuilding energy consumption to meet the requirements below. Develop and implement a Measurement & Verification (M&V) program in accordance with Option D: Calibrated Simulation (either Savings Estimation Method 1 or 2), as specified by the International Performance Measurement and Verification Protocol (IPMVP), Concepts and Options for Determining Energy Savings in New Construction, Volume III, 2006. The M&V period must cover at least one year of post-construction occupancy. An executed contract(s) must be in place for all services necessary to execute the M&V program, including the eventual submittal of the final M&V report to the project team and building owner, including
- Reconciliation between actual energy use and energy use predicted by EA Credit 1.
- Discussion of reconciliation and variances between actual energy use and energy use predicted by EA Credit 1.
- Actual avoided energy use compared to the EA Credit 1 baseline.
- Avoided energy costs compared to the EA Credit 1 baseline.
- Avoided GHG emissions compared to the EA Credit 1 baseline.
- Recommendations for any remedial or future action.
General Pilot Documentation Requirements
Register for the pilot credit- Participate in the LEEDuser pilot credit forum
- Complete the feedback survey:
Credit specific
Note: As the pilot continues, requirements and submittal requirements will evolve. Please submit any additional documentation that you believe would be helpful in supporting your claims. This feedback will assist in future credit revisions. All Projects:- Complete the Google Form as submittal for this credit. AND
- Upload. Provide a copy of the contract(s) in place for all services necessary to execute the M&V program.
- Upload. Provide a copy of the M&V Plan consistent with Option D: Calibrated Simulation in IPMVP Volume III, 2006.
Additional Questions
- Were there barriers to implementing the strategies used under this credit?