Update the Block Length Calculations to read as follows:
Total Project Street Frontage = 350ft
Total Frontage with Minimum Ratio = 300ft
Frontage Achieving Minimum Ratio = 85%
LEEDuser overview
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Design and build the project to achieve all of the following:
What does it cost?
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Already a premium member? Log in now
Checklists
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
Already a premium member? Log in now
Documentation toolkit
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Already a premium member? Log in now
Addenda
Update the Block Length Calculations to read as follows:
Total Project Street Frontage = 350ft
Total Frontage with Minimum Ratio = 300ft
Frontage Achieving Minimum Ratio = 85%
Delete second bullet, "For the nonresidential and mixed-use setback from sidewalks requirements (c), the distance of the setback must be measured from the property line."
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Design and build the project to achieve all of the following:
Addenda
Update the Block Length Calculations to read as follows:
Total Project Street Frontage = 350ft
Total Frontage with Minimum Ratio = 300ft
Frontage Achieving Minimum Ratio = 85%
Delete second bullet, "For the nonresidential and mixed-use setback from sidewalks requirements (c), the distance of the setback must be measured from the property line."