LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Establishment
Evaluate building systems and equipment for participation in a demand response program. On-site electricity generation does not meet the intent of this credit.Case 1. Demand response program available (3 points)
Participate in an existing demand response (DR) program and complete the following activities.- Have in place a system with the capability for real-time, fully automated DR based on external initiation by a DR program provider. Semi-automated DR may be utilized in practice.
- Enroll in a minimum one-year DR participation amount contractual commitment with a qualified DR program provider, with the intention of multiyear renewal, for at least 10% of the annual peak electricity demand. Peak demand is based on electric utility bills.
- Develop a comprehensive plan for meeting the contractual commitment during a Demand Response event.
- Include the DR processes in the current facilities requirements and operations and maintenance plan.
- Initiate at least one full test of the DR plan.
Case 2. Demand response program not available (1 point)
Have infrastructure in place to take advantage of future demand response programs or dynamic, real-time pricing programs and complete the following activities.- Develop a comprehensive plan for shed at least 10% of the annual peak electricity demand. Peak demand is based on electric utility bills.
- Include the DR processes in the current facilities requirements and operations and maintenance plan.
- Initiate at least one full test of the DR plan.
- Contact local utility representatives to discuss participation in future DR programs.
Case 3. Permanent load shifting (2 points)
Implement electrical load shifting measures with the following requirements:- Have in place during the performance period a system which permanently transfers electricity demand from peak hours to off-peak hours as defined by the local utility provider.
- Demonstrate that the facility is successfully reducing peak demand by 10% during the performance period as compared to peak electrical demand by:
- Identifying all load shifting measures and their intended peak electrical load shift
- Verifying a corresponding peak electrical load reduction for each measure
- Verifying a corresponding off-peak electrical load increase for each measure
- Include the load shifting measures in the current facilities requirements and operations and maintenance plan.
Performance
None. See all forum discussions about this credit »What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Establishment
Evaluate building systems and equipment for participation in a demand response program. On-site electricity generation does not meet the intent of this credit.Case 1. Demand response program available (3 points)
Participate in an existing demand response (DR) program and complete the following activities.- Have in place a system with the capability for real-time, fully automated DR based on external initiation by a DR program provider. Semi-automated DR may be utilized in practice.
- Enroll in a minimum one-year DR participation amount contractual commitment with a qualified DR program provider, with the intention of multiyear renewal, for at least 10% of the annual peak electricity demand. Peak demand is based on electric utility bills.
- Develop a comprehensive plan for meeting the contractual commitment during a Demand Response event.
- Include the DR processes in the current facilities requirements and operations and maintenance plan.
- Initiate at least one full test of the DR plan.
Case 2. Demand response program not available (1 point)
Have infrastructure in place to take advantage of future demand response programs or dynamic, real-time pricing programs and complete the following activities.- Develop a comprehensive plan for shed at least 10% of the annual peak electricity demand. Peak demand is based on electric utility bills.
- Include the DR processes in the current facilities requirements and operations and maintenance plan.
- Initiate at least one full test of the DR plan.
- Contact local utility representatives to discuss participation in future DR programs.
Case 3. Permanent load shifting (2 points)
Implement electrical load shifting measures with the following requirements:- Have in place during the performance period a system which permanently transfers electricity demand from peak hours to off-peak hours as defined by the local utility provider.
- Demonstrate that the facility is successfully reducing peak demand by 10% during the performance period as compared to peak electrical demand by:
- Identifying all load shifting measures and their intended peak electrical load shift
- Verifying a corresponding peak electrical load reduction for each measure
- Verifying a corresponding off-peak electrical load increase for each measure
- Include the load shifting measures in the current facilities requirements and operations and maintenance plan.
Performance
None.Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »