LEED v4
Existing Data Centers
Energy and Atmosphere

Advanced energy metering

Data-Centers-EBOM-v4 EAc5: Advanced energy metering

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Install advanced energy metering for the following:
  • all whole-building energy sources used by the building; and
  • major end uses that represent 20% or more of the total annual consumption of the building minus plug load use.
The advanced energy metering must have the following characteristics.
  • Meters must be permanently installed, record at intervals of one hour or less, and transmit data to a remote location.
  • Electricity meters must record both consumption and demand. Whole-building electricity meters should record the power factor, if appropriate.
  • The data collection system must use a local area network, building automation system, wireless network, or comparable communication infrastructure.
  • The system must be capable of storing all meter data for at least 36 months.
  • The data must be remotely accessible.
  • All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use.

Performance

Program the facility’s energy management system to set an alarm whenever the energy consumption and peak demand rise above the anticipated amount by more than 5%. The anticipated consumption and peak should be determined by analyzing historical facility performance and weather and operating conditions and should be set on at least monthly, preferably daily. Demand measurements must be taken in time increments no longer than the increments used for utility billing or in one-hour increments, whichever is less time. On at least a monthly basis, report the facility’s utility peak demand and total consumption and compare it with the data for the previous month and the same month from the previous year. See all forum discussions about this credit »

Frequently asked questions

Are tenant spaces considered to be an “energy end use”? In other words, can we achieve this credit by metering tenant energy consumption?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to meter plug loads separately? Based on our energy end-use breakdown, plug loads account for more than 20% of my building’s total annual energy consumption.

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we need to separately meter our onsite renewable energy system? If so, do the meters need to meet the advanced metering requirements?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do manually read meters meet the credit requirements?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to complete an ASHRAE Level 2 audit in order to identify energy end uses and achieve this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

10/04/2020– Updated: 22/04/2020
Reference Guide Correction
Description of change:
100002336 - Advanced Energy Metering Guidance

In Further Explanation, Determining Major Energy End Uses, before the paragraph starting with “Choosing what equipment and components to group”, add the following paragraph:

It is acceptable to exclude a small portion of the total loads from each end-use category. Not more than 10% of the total connected load of any of the required end-uses is permitted to be excluded from that end-use advanced metering data collection. Not more than 10% of the total connected load of any of the end-uses where metering is required is permitted to consist of loads not part of that end-use.

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Ben Stanley

WSP - Built Ecology
Senior Sustainability Manager

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

Install advanced energy metering for the following:
  • all whole-building energy sources used by the building; and
  • major end uses that represent 20% or more of the total annual consumption of the building minus plug load use.
The advanced energy metering must have the following characteristics.
  • Meters must be permanently installed, record at intervals of one hour or less, and transmit data to a remote location.
  • Electricity meters must record both consumption and demand. Whole-building electricity meters should record the power factor, if appropriate.
  • The data collection system must use a local area network, building automation system, wireless network, or comparable communication infrastructure.
  • The system must be capable of storing all meter data for at least 36 months.
  • The data must be remotely accessible.
  • All meters in the system must be capable of reporting hourly, daily, monthly, and annual energy use.

Performance

Program the facility’s energy management system to set an alarm whenever the energy consumption and peak demand rise above the anticipated amount by more than 5%. The anticipated consumption and peak should be determined by analyzing historical facility performance and weather and operating conditions and should be set on at least monthly, preferably daily. Demand measurements must be taken in time increments no longer than the increments used for utility billing or in one-hour increments, whichever is less time. On at least a monthly basis, report the facility’s utility peak demand and total consumption and compare it with the data for the previous month and the same month from the previous year. See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Frequently asked questions

Are tenant spaces considered to be an “energy end use”? In other words, can we achieve this credit by metering tenant energy consumption?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to meter plug loads separately? Based on our energy end-use breakdown, plug loads account for more than 20% of my building’s total annual energy consumption.

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we need to separately meter our onsite renewable energy system? If so, do the meters need to meet the advanced metering requirements?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do manually read meters meet the credit requirements?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to complete an ASHRAE Level 2 audit in order to identify energy end uses and achieve this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

10/04/2020– Updated: 22/04/2020
Reference Guide Correction
Description of change:
100002336 - Advanced Energy Metering Guidance

In Further Explanation, Determining Major Energy End Uses, before the paragraph starting with “Choosing what equipment and components to group”, add the following paragraph:

It is acceptable to exclude a small portion of the total loads from each end-use category. Not more than 10% of the total connected load of any of the required end-uses is permitted to be excluded from that end-use advanced metering data collection. Not more than 10% of the total connected load of any of the end-uses where metering is required is permitted to consist of loads not part of that end-use.

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
See all forum discussions about this credit »
Guest expert

Ben Stanley

WSP - Built Ecology
Senior Sustainability Manager