"Group Approach
All buildings in the group may be documented as one.
Campus Approach
Ineligible."
LEED CREDIT
LEEDuser’s viewpoint
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
OR
OR
What does it cost?
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
What exactly do I need to track during the performance period?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is there a 20% performance threshold like in LEED 2009 SSc2?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
If all of the onsite landscaping is done by a contractor that only uses 100% electric equipment does the contractor need to document the maintenance of the equipment for the credit to be achieved? They have many items that are the same and so they do not keep track of which specific mower was brought to the site, for example.The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Addenda
Documentation toolkit
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
OR
OR
In the end, LEED is all about documentation. LEEDuser’s Documentation Toolkit, for premium members only, saves you time and helps you avoid mistakes with:
What exactly do I need to track during the performance period?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Is there a 20% performance threshold like in LEED 2009 SSc2?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
If all of the onsite landscaping is done by a contractor that only uses 100% electric equipment does the contractor need to document the maintenance of the equipment for the credit to be achieved? They have many items that are the same and so they do not keep track of which specific mower was brought to the site, for example.The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |