Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

None.

Performance

Implement the lighting purchasing plan that specifies an overall building average of 70 picograms of mercury per lumen-hour or less for all mercury-containing lamps purchased for the building and associated grounds within the project boundary. Include lamps for both indoor and outdoor fixtures, as well as both hard-wired and portable fixtures. Lamps containing no mercury may be counted only if their energy efficiency at least equals that of their mercury-containing counterparts. See all forum discussions about this credit »

Frequently asked questions

The project building includes a significant amount of process lighting. Do these lamps need to be included?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Is there a minimum number of lamps that need to be purchased during the performance period in order to achieve this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

We purchase lamps for some of our tenants, but not all of them. Can lamps for these tenant spaces be excluded?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Our building average is over 70 picograms per lumen hour for installed lamps. Do we have to replace lamps before they’ve reached the end of their useful life in order to reach the credit threshold?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How should I account for LED purchases? Do I have to show that the LEDs are as energy efficient as similar mercury-containing lamps?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do lamps purchased for task lighting need to be included in my calculations?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

I can’t find mean lumens on the manufacturer documentation. What should I do?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

01/10/2016– Updated: 28/09/2016
Form Update
Description of change:
5000054

updated formula so that lamp calculations are based on a weighted average.

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
01/10/2015– Updated: 21/01/2016
Reference Guide Correction
Description of change:
100002036

Remove the first sentence from the first bullet under Step 5 :"Lamps must be purchased during the performance period for project teams to earn this credit."
Update "Required Documentation" section row three with the following: "List of purchased lamps, verifying compliance with the plan, or confirmation that no lamps were needed"

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »
Guest expert

Barry Giles

BuildingWise LLC
Founder & CEO, LEED Fellow, BREEAM Fellow

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Establishment

None.

Performance

Implement the lighting purchasing plan that specifies an overall building average of 70 picograms of mercury per lumen-hour or less for all mercury-containing lamps purchased for the building and associated grounds within the project boundary. Include lamps for both indoor and outdoor fixtures, as well as both hard-wired and portable fixtures. Lamps containing no mercury may be counted only if their energy efficiency at least equals that of their mercury-containing counterparts. See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Frequently asked questions

The project building includes a significant amount of process lighting. Do these lamps need to be included?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Is there a minimum number of lamps that need to be purchased during the performance period in order to achieve this credit?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

We purchase lamps for some of our tenants, but not all of them. Can lamps for these tenant spaces be excluded?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Our building average is over 70 picograms per lumen hour for installed lamps. Do we have to replace lamps before they’ve reached the end of their useful life in order to reach the credit threshold?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

How should I account for LED purchases? Do I have to show that the LEDs are as energy efficient as similar mercury-containing lamps?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do lamps purchased for task lighting need to be included in my calculations?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

I can’t find mean lumens on the manufacturer documentation. What should I do?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

01/10/2016– Updated: 28/09/2016
Form Update
Description of change:
5000054

updated formula so that lamp calculations are based on a weighted average.

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
01/10/2015– Updated: 21/01/2016
Reference Guide Correction
Description of change:
100002036

Remove the first sentence from the first bullet under Step 5 :"Lamps must be purchased during the performance period for project teams to earn this credit."
Update "Required Documentation" section row three with the following: "List of purchased lamps, verifying compliance with the plan, or confirmation that no lamps were needed"

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
Yes
See all forum discussions about this credit »