CI-v4 IPc1: Integrative process 1-2 points
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems.Requirements
Site Selection and Energy-Related Systems (1 point)
Starting in predesign and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems. Use the analyses described below to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents. Conduct analyses in site selection and energy-related systems (1 point).Site Selection
Before site selection, analyze project goals to identify and select the building site that will provide the most opportunities and fewest barriers for the tenant improvement project. Assess at least two potential locations or base building options, taking into consideration at least the following:- Building site attributes. Assess the base building’s location and site design characteristics.
- Transportation. Assess the tenant occupants’ transportation needs for commuting to and from the site, including convenient access to alternative transportation that meets occupants’ needs.
- Building features. Assess the base building’s envelope, mechanical and electrical systems that will affect tenant space (e.g., controls, HVAC, plumbing fixtures, renewable energy supply), adaptability to future needs, and resilience in the event of disaster or infrastructure failure.
- Occupants’ well-being. Assess the base building’s ability to provide daylight and views, indoor air quality, and other indoor environmental quality characteristics.
Implementation:
Document how the above analysis informed selection of a building site for the project’s tenant improvement and informed the OPR and BOD and site selection for the interior design project, including the following, as applicable:- suitability of the base building for meeting project goals relative to the building’s site attributes;
- suitability of the base building site location for meeting daily occupants’ commuting needs;
- suitability of the base building’s mechanical and electrical systems for meeting project goals;
- capability of the tenant space for meeting the project’s goals related to indoor environmental quality and occupants’ well-being; and
- other systems.
Energy-Related Systems
Discovery:
Perform a preliminary energy analysis before the completion of schematic design that explores how to reduce energy loads for the interior design project and accomplish related sustainability goals by questioning default assumptions and testing options. Assess at least two potential options associated with each of the following in terms of project and human performance:- Basic envelope attributes. Insulation values, window-to-wall ratios, glazing characteristics, shading, window operability.
- Programmatic and operational parameters. Multifunctioning spaces, operating schedules, space allotment per person, teleworking, reducing building area, ongoing operations and maintenance issues.
- Lighting levels. Interior surface reflectance values and lighting levels in occupied spaces.
- Thermal comfort ranges. Assess thermal comfort range options.
- Plug and process load needs. Reducing plug and process loads through programmatic solutions such as equipment and purchasing policies or layout options.
- building envelope and façade conditions;
- elimination and/or significant downsizing of building systems (e.g., HVAC, lighting, controls, exterior materials, interior finishes, functional program elements);
- methods planned to gather feedback on energy performance and occupants’ satisfaction during operations.; and
- other systems. Project teams may also choose Option 1 for an additional point..
- Fixture and fitting water demand. Assess flow and flush fixture demand volumes, calculated in accordance with WE Prerequisite Indoor Water Use Reduction.
- Process water demand. Assess kitchen, laundry, cooling tower, and other equipment demand volumes, as applicable.
- Supply sources. Assess all potential nonpotable water supply source volumes, such as on-site rainwater and graywater, municipally supplied nonpotable water, and HVAC equipment condensate.
- plumbing systems;
- sewage conveyance and/or on-site treatment systems;
- process water systems;
- methods planned to gather feedback on the performance and efficiency of water-related systems during operations; and
- other systems.
Option 1. Water-Related Systems (1 point)
Perform a preliminary water budget analysis before the completion of schematic design that explores how to reduce potable water loads and accomplish related sustainability goals. Assess and estimate the project’s potential nonpotable water supply sources and water demand volumes, including the following:Frequently asked questions
This is the only credit in the IP credit category. Do all teams have to pursue it?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do we have to adopt all strategies that improve energy or water performance based on the analysis?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Checklists
Step by step to LEED certification
LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
LEEDuser overview
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Intent
To support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems.Requirements
Site Selection and Energy-Related Systems (1 point)
Starting in predesign and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems. Use the analyses described below to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents. Conduct analyses in site selection and energy-related systems (1 point).Site Selection
Before site selection, analyze project goals to identify and select the building site that will provide the most opportunities and fewest barriers for the tenant improvement project. Assess at least two potential locations or base building options, taking into consideration at least the following:- Building site attributes. Assess the base building’s location and site design characteristics.
- Transportation. Assess the tenant occupants’ transportation needs for commuting to and from the site, including convenient access to alternative transportation that meets occupants’ needs.
- Building features. Assess the base building’s envelope, mechanical and electrical systems that will affect tenant space (e.g., controls, HVAC, plumbing fixtures, renewable energy supply), adaptability to future needs, and resilience in the event of disaster or infrastructure failure.
- Occupants’ well-being. Assess the base building’s ability to provide daylight and views, indoor air quality, and other indoor environmental quality characteristics.
Implementation:
Document how the above analysis informed selection of a building site for the project’s tenant improvement and informed the OPR and BOD and site selection for the interior design project, including the following, as applicable:- suitability of the base building for meeting project goals relative to the building’s site attributes;
- suitability of the base building site location for meeting daily occupants’ commuting needs;
- suitability of the base building’s mechanical and electrical systems for meeting project goals;
- capability of the tenant space for meeting the project’s goals related to indoor environmental quality and occupants’ well-being; and
- other systems.
Energy-Related Systems
Discovery:
Perform a preliminary energy analysis before the completion of schematic design that explores how to reduce energy loads for the interior design project and accomplish related sustainability goals by questioning default assumptions and testing options. Assess at least two potential options associated with each of the following in terms of project and human performance:- Basic envelope attributes. Insulation values, window-to-wall ratios, glazing characteristics, shading, window operability.
- Programmatic and operational parameters. Multifunctioning spaces, operating schedules, space allotment per person, teleworking, reducing building area, ongoing operations and maintenance issues.
- Lighting levels. Interior surface reflectance values and lighting levels in occupied spaces.
- Thermal comfort ranges. Assess thermal comfort range options.
- Plug and process load needs. Reducing plug and process loads through programmatic solutions such as equipment and purchasing policies or layout options.
- building envelope and façade conditions;
- elimination and/or significant downsizing of building systems (e.g., HVAC, lighting, controls, exterior materials, interior finishes, functional program elements);
- methods planned to gather feedback on energy performance and occupants’ satisfaction during operations.; and
- other systems. Project teams may also choose Option 1 for an additional point..
- Fixture and fitting water demand. Assess flow and flush fixture demand volumes, calculated in accordance with WE Prerequisite Indoor Water Use Reduction.
- Process water demand. Assess kitchen, laundry, cooling tower, and other equipment demand volumes, as applicable.
- Supply sources. Assess all potential nonpotable water supply source volumes, such as on-site rainwater and graywater, municipally supplied nonpotable water, and HVAC equipment condensate.
- plumbing systems;
- sewage conveyance and/or on-site treatment systems;
- process water systems;
- methods planned to gather feedback on the performance and efficiency of water-related systems during operations; and
- other systems.
Option 1. Water-Related Systems (1 point)
Perform a preliminary water budget analysis before the completion of schematic design that explores how to reduce potable water loads and accomplish related sustainability goals. Assess and estimate the project’s potential nonpotable water supply sources and water demand volumes, including the following:Frequently asked questions
This is the only credit in the IP credit category. Do all teams have to pursue it?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do we have to adopt all strategies that improve energy or water performance based on the analysis?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
For full access, sign up now for LEEDuser Premium
Already a premium member? Log in now
Frequently asked questions
This is the only credit in the IP credit category. Do all teams have to pursue it?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |
Do we have to adopt all strategies that improve energy or water performance based on the analysis?The answer to this question is available to LEEDuser premium members. Start a free trial » (If you're already a premium member, log in here.) |