Replace "allowable acreage" with "allowable land area"
LEEDuser’s viewpoint
Explore this LEED credit
Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Include in the project a residential component that constitutes at least 30% of the project’s total building floor area, and locate or design the project such that at least 50% of the dwelling units are within a 1/2-mile (800 meters) walk distance of an existing or new elementary or middle school building entrance or within a 1-mile (1600 meters) walk distance of an existing or new high school building entrance. For any new school, the school district or equivalent organization must commit in a legally binding warrant that the school will be open by the time of occupancy of 50% of the project dwelling units. Streets within and/or bordering the project boundary that lead from dwelling units to the school site must have a complete network of sidewalks on both sides and either bicycle lanes or traffic control and/or calming measures. If the school is planned as part of the project, it must be designed such that pedestrians and cyclists can easily reach building entrances without crossing bus zones, parking entrances, and student drop-off areas.
AND
New school campuses must not exceed the following:- High schools, 15 acres (6 hectares);
- Middle schools, 10 acres (4 hectares);
- Elementary schools, 5 acres (2 hectares). Schools combining grade levels from more than one category may use the grade level with the higher allowable land area. Facilities on the school site for which there is a formal joint-use agreement with another entity, such as athletic facilities, playgrounds, and multipurpose spaces in buildings, may be deducted from the total site area of the school.
What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
Replace "allowable acreage" with "allowable land area"
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Include in the project a residential component that constitutes at least 30% of the project’s total building floor area, and locate or design the project such that at least 50% of the dwelling units are within a 1/2-mile (800 meters) walk distance of an existing or new elementary or middle school building entrance or within a 1-mile (1600 meters) walk distance of an existing or new high school building entrance. For any new school, the school district or equivalent organization must commit in a legally binding warrant that the school will be open by the time of occupancy of 50% of the project dwelling units. Streets within and/or bordering the project boundary that lead from dwelling units to the school site must have a complete network of sidewalks on both sides and either bicycle lanes or traffic control and/or calming measures. If the school is planned as part of the project, it must be designed such that pedestrians and cyclists can easily reach building entrances without crossing bus zones, parking entrances, and student drop-off areas.
AND
New school campuses must not exceed the following:- High schools, 15 acres (6 hectares);
- Middle schools, 10 acres (4 hectares);
- Elementary schools, 5 acres (2 hectares). Schools combining grade levels from more than one category may use the grade level with the higher allowable land area. Facilities on the school site for which there is a formal joint-use agreement with another entity, such as athletic facilities, playgrounds, and multipurpose spaces in buildings, may be deducted from the total site area of the school.