LEED CREDIT

ND-v2009 SLLc5: Housing and Jobs Proximity 1-3 points

LEEDuser’s viewpoint

Explore this LEED credit

Post your questions on this credit in the forum, and click on the credit language tab to review to the LEED requirements.

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

OPTION 1. Project with affordable residential component (3 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate and/or design the project such that the geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of existing full-time-equivalent jobs whose number is equal to or greater than the number of dwelling units in the project; and satisfy the requirements necessary to earn at least one point under NPD Credit 4, Mixed-Income Diverse Communities, Option 2, Affordable Housing.

OR

Option 2. Project With residential component (2 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate and/or design the project such that the geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of existing full-time-equivalent jobs whose number is equal to or greater than the number of dwelling units in the project.

OR

Option 3. Infill project with nonresidential component (1 point)
Include a nonresidential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate on an infill site whose geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of an existing rail transit, ferry, or tram stop and within 1/2-mile (800 meter) walk distance of existing dwelling units whose number is equal to or greater than 50% of the number of new full-time-equivalent jobs created as part of the project. See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $... »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $15.95 » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

This article is BuildingGreen Premium content

Two ways to read the full article and get CEUs:

Sign up for BuildingGreen Premium to access all our premium content

Join for just $19.95/month »

Purchase this article to get online access and a printable PDF.

Buy it now for $39 »

Already a premium member? Log in now

To read the full article, subscribe now to BuildingGreen Premium

For full access, sign up now for LEEDuser Premium

LEEDuser tip sheets, written by our team of LEED experts, fill gaps in knowledge we’ve observed between the LEED Reference Guide, LEED Online, and LEED Interpretations. We update them regularly so that our members get the most relevant guidance for current issues on their projects.

( does not provide premium access to LEEDuser)

Go premium for just $19.95 » Go premium for just $... » Firm or campus members – click here »

Your 15-day free trial expired on

Already a premium member? Log in now

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

OPTION 1. Project with affordable residential component (3 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate and/or design the project such that the geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of existing full-time-equivalent jobs whose number is equal to or greater than the number of dwelling units in the project; and satisfy the requirements necessary to earn at least one point under NPD Credit 4, Mixed-Income Diverse Communities, Option 2, Affordable Housing.

OR

Option 2. Project With residential component (2 points)
Include a residential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate and/or design the project such that the geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of existing full-time-equivalent jobs whose number is equal to or greater than the number of dwelling units in the project.

OR

Option 3. Infill project with nonresidential component (1 point)
Include a nonresidential component equaling at least 30% of the project’s total building floor area (exclusive of parking structures), and locate on an infill site whose geographic center (or boundary if the project exceeds 500 acres / 200 hectares) is within 1/2-mile (800 meters) walk distance of an existing rail transit, ferry, or tram stop and within 1/2-mile (800 meter) walk distance of existing dwelling units whose number is equal to or greater than 50% of the number of new full-time-equivalent jobs created as part of the project.