LEEDuser’s viewpoint
Frank advice from LEED experts
LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.
Credit language
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1: Development density
Construct or renovate a building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (13,800 square meters per hectare net). The density calculation is based on a typical two-story downtown development and must include the area of the project being built.OR
Option 2: Community connectivity
Construct or renovate a building on a site that meets the following criteria:- Is located on a previously developed site
- Is within 1/2 mile (800 meters) of a residential area or neighborhood with an average density of 10 units per acre net
- Is within 1/2 mile (800 meters) of at least 10 basic services
- Has pedestrian access between the building and the services
- Bank
- Place of Worship
- Convenience Grocery
- Day Care Center
- Cleaners
- Fire Station
- Beauty Salon
- Hardware
- Laundry
- Library
- Medical or Dental Office
- Senior Care Facility
- Park
- Pharmacy
- Post Office
- Restaurant
- School
- Supermarket
- Theater
- Community Center
- Fitness Center
- Museum
- Hotel
- Medical Device Supplier
- Home Healthcare Service Provider
- Healthcare Support Agencies
- Family Support Facility
- Rehabilitation Facility
OR
Option 3: Existing rural sites1
For previously developed existing rural healthcare campus sites, achieve a minimum development density of 30,000 square feet per acre (6,900 square meters per hectare). 1For the purposes of this credit, “rural land” is defined in accordance with U.S. Census Bureau definitions: settlements comprising less than 2,500 persons, areas outside incorporated census designated places and the rural portions of extended cities. For additional information, visit http://www.census.gov/population/censusdata/urdef.txt.Streamlined path available
Achievement of this credit can be documented via a LEED ND v2009 submittal. For more information check out this article.SITES-LEED Equivalency
This LEED credit (or a component of this credit) has been established as equivalent to a SITES v2 credit or component. For more information on using the equivalency as a substitution in your LEED or SITES project, see this article and guidance document.What does it cost?
Cost estimates for this credit
On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.
Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.
This information is also available in a full PDF download in The Cost of LEED v4 report.
Learn more about The Cost of LEED v4 »Frequently asked questions
See all forum discussions about this credit »Addenda
Documentation toolkit
The motherlode of cheat sheets
LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.
Get the inside scoop
Our editors have written a detailed analysis of nearly every LEED credit, and LEEDuser premium members get full access. We’ll tell you whether the credit is easy to accomplish or better left alone, and we provide insider tips on how to document it successfully.
© Copyright U.S. Green Building Council, Inc. All rights reserved.
Requirements
Option 1: Development density
Construct or renovate a building on a previously developed site AND in a community with a minimum density of 60,000 square feet per acre net (13,800 square meters per hectare net). The density calculation is based on a typical two-story downtown development and must include the area of the project being built.OR
Option 2: Community connectivity
Construct or renovate a building on a site that meets the following criteria:- Is located on a previously developed site
- Is within 1/2 mile (800 meters) of a residential area or neighborhood with an average density of 10 units per acre net
- Is within 1/2 mile (800 meters) of at least 10 basic services
- Has pedestrian access between the building and the services
- Bank
- Place of Worship
- Convenience Grocery
- Day Care Center
- Cleaners
- Fire Station
- Beauty Salon
- Hardware
- Laundry
- Library
- Medical or Dental Office
- Senior Care Facility
- Park
- Pharmacy
- Post Office
- Restaurant
- School
- Supermarket
- Theater
- Community Center
- Fitness Center
- Museum
- Hotel
- Medical Device Supplier
- Home Healthcare Service Provider
- Healthcare Support Agencies
- Family Support Facility
- Rehabilitation Facility
OR