Hiring construction teams with LEED experience is helpful, as is reviewing LEED requirements and responsibilities with the contractor during the bidding process.
Some contractors may charge a premium for implementing and documenting this credit, but in general, added costs should be minor as more firms start incorporating these as standard best practices.
Masterspec offers sample LEED specifications for construction documents. It includes an entire section specific to IAQ management. (See Resources.) The contractor also needs to protect absorptive material from moisture.
SMACNA guidelines, there is a right way to do it—and then there are the other ways, like this poorly covered ductwork. Do it right, and document it with photos.
This credit relies heavily on SMACNA’s best-practice management guide that addresses construction IAQ management in five areas: HVAC protection, source control, pathway interruption, housekeeping, and scheduling.