ad-100000407

Replace the text with "Breathing zone is the region within an occupiedspace between 3 and 6 feet above the floor. Note that this definitionvaries from that of ASHRAE 62.1-2007, which states that the breathingzone is between 3 inches and 6 feet from the floor, and 2 feet from thewalls as well as fixed air conditioning equipment."

ad-100000531

"No additional points are available for exemplary performance." change to: "Projects that reduce overall outdoor water demand by 65% or more should be awarded 1 point for exemplary performance, to be counted under Innovation & Design Process Credit 3. A reduction of 70% is worth 2 points; a reduction of 75% is worth 3 points; a reduction of 80% is worth 4 points. "

ad-100000528

"A certified landscape professional or irrigation professional should assist the project team with the calculation. If no professional is involved, use the most conservative assumptions (i.e., assumptions that result in the highest "as-designed" water use rate)." change to: "A landscape professional must perform the calculation. This includes individuals with certification, licensure, formal training (higher education), or at least 10 years of professional experience."

ad-100000527

[Add new paragraph between 1st and 2nd paragraphs of Calculations section.] "If a temporary irrigation system is installed below ground , it should be treated as permanent and it can be awarded points under WE 2.1. If an irrigation system is installed above ground, it should be treated as temporary and it cannot be awarded points under WE 2.1"

ad-100000526

[Add new paragraph to the beginning of Calculations section] "A guidance document and accompanying calculator have been developed for performing the calculation for this credit. Please contact your LEED for Homes Provider for these resources."

ad-100000525

"Projects that use the performance approach cannot earn points for prescriptive measures in SS 2.2, 2.3, and 2.4 or WE 2.1 and 2.2." change to "Projects that use the performance approach cannot earn points for prescriptive measures in SS 2.3, SS 2.4, WE 2.1, or WE 2.2, and can earn only partial credit in SS 2.2."

ad-100000524

"Projects that implement irrigation measures beyond the maximum 3 points in this credit can earn additional points, to be counted in Innovation & Design 3." change to: "Projects that install more than 3 of the measures listed in WE 2.1 should be awarded exemplary performance credit, to be counted in Innovation & Design 3 (ID 3). Projects with only landscaping beds (i.e., no turf) that are served only by low-volume and point source irrigation (e.g., drip) can earn 0.5 point of exemplary performance credit, to be counted in Innovation & Design 3."

ad-100000416

At the end of the paragraph, insert the text "The GS-11 VOC limits applicable for this credit are summarized in Table 1. IEQc4.2 Applicable VOC Limits. "