Implement a quality control program to ensure that construction waste from facility alterations or additions is not mishandled. Perform periodic checks, and generate reports during the performance period to ensure that the target waste-diversion rate is b

Implement a quality control program to ensure that construction waste from facility alterations or additions is not mishandled. Perform periodic checks, and generate reports during the performance period to ensure that the target waste-diversion rate is being met and that the correct information is being collected for all waste leaving the site.

Construction waste must be isolated from the ongoing consumable waste stream in order to get an accurate measurement of the waste generated from construction activities. Even if the two waste streams will ultimately be recycled or landfilled via the same

Construction waste must be isolated from the ongoing consumable waste stream in order to get an accurate measurement of the waste generated from construction activities. Even if the two waste streams will ultimately be recycled or landfilled via the same dumpster, construction waste still should be separated and measured prior to being mixed with other waste types.  

Achieving this credit also depends on the experience and willingness of contractors and haulers to participate in waste management practices. It is crucial to educate contractors and subcontractors about waste separation and tracking and to enable constan

Achieving this credit also depends on the experience and willingness of contractors and haulers to participate in waste management practices. It is crucial to educate contractors and subcontractors about waste separation and tracking and to enable constant communication with facility personnel in order to achieve these credit goals.