All the design work is implemented during construction. Have the project architect ensure that the glazing is per your specifications and that the façade system incorporates a continuous air barrier. The commissioning agent will ensure all equipment purch

All the design work is implemented during construction. Have the project architect ensure that the glazing is per your specifications and that the façade system incorporates a continuous air barrier. The commissioning agent will ensure all equipment purchased is exactly what the engineer required, and that all pumps and fans meet the specifications. 

Make sure mechanical spaces and locations are coordinated in the architectural and structural drawings. For example, is a duct run colliding with a beam? Is a fan coil unit placed above a door opening so that it will leak condensate on people walking into

Make sure mechanical spaces and locations are coordinated in the architectural and structural drawings. For example, is a duct run colliding with a beam? Is a fan coil unit placed above a door opening so that it will leak condensate on people walking into the space? Common mistakes like this can cause construction delays and poor performance during operations if not detected, so coordination of the drawings is critical, especially if your project involves integrated design and complex systems.