ad-100000721

Make the first sentence of the second, third, and fourth paragraphs bold so it becomes "Minimum Narrative Requirements, Policy, Program, and Plan Models, and Declarant Definitions and Other Definitions ," respectively

ad-100000732

Under the first bullet, add a second bullet with the following text:For projects where asbestos is found, prepare executive summary-levelcontent from the investigation\'s report explaining the extent of thecontamination and required action as well as documentation indicatingan acceptable level of remediation was achieved based on anacceptable standard, such as RCRA or NESHAPs.

ad-100000731

At the end of the paragraph, add the following text:Projects where asbestos is found and remediated may also earn thiscredit. Testing should be done in accordance with EPA Reg 40CFR part763, when applicable.

ad-100001091

In alphabetical order, add the following definition for occupied spaces, "Occupied Spaces are defined as enclosed spaces that can accommodate human activities. Occupied spaces are further classified as regularly occupied or non-regularly occupied spaces based on the duration of the occupancy, individual or multi-occupant based on the quantity of occupants, and densely or non-densely occupied spaces based upon the concentration of occupants in the space."

ad-100000738

Replace the text under "CASE 1" with the following:There are no calculations required for this credit, unless a projectcannot limit site disturbance for every parameter. In such a case, anaverage is acceptable, as long as 3 of the 4 disturbance limits aremet. Project teams should calculate the amount of site disturbanceallowed under the requirements for greenfield sites and then theamount of actual site disturbance. The actual should be less than theallowable.

ad-100001028

Below equation, add the text and equation:Alternatively, a weighted average approach may be used to calculate compliance for multiple materials:(see image)