If you complete the documentation for EAp2, Option 2, you automatically earn a point through EAc1. The requirements are identical to EAp2 and require minimum additional time on the part of your engineer.
Option 2: Prescriptive Compliance Path—ASHRAE Advanced Energy Design Guides
Even if you’re using Option 1, refer to the Advanced Energy Design Guides and Core Performance Guide (referenced by Options 2 and 3) for ideas on cost-effective measures to implement.
Energy-efficient design can increase your construction budget. Use your computer model to optimize packages of upgrades that balance any added costs against cost savings, and run payback analyses to identify the most cost-effective options.
If your building includes the use of purchased steam supplied to your HVAC system, the proposed (design) building is modeled as if the steam system is “located” in the building— with the same efficiency with which it typically operates. The designed building is allocated only the fuel cost (for natural gas or oil) required to generate and deliver the steam needed for the building. The steam purchased is actually considered “free,” as steam rates are not included.
Consider highly efficient systems like heat pumps for heating and cooling, district energy and cogeneration, ice storage for off-peak cooling, or energy recovery ventilation—to attain a substantial energy reduction of 10%-20%.
Your mechanical engineer and energy modeler need to work in collaboration with the architect when finalizing building form, façade treatment, and programming—to give real-time input on the energy impact of all the design features.
Follow the guidelines on identifying energy-efficiency strategies to achieve the owner’s energy efficiency goals per the Owner’s Project Requirements, developed for EAp1: Fundamental Commissioning.
The model you need to develop for EAc1 is the same as for EAp2 (unless you’re on a district energy system).