If your project is an existing site with parking, you can revamp the parking spaces (and even rearrange the layout) and still earn this credit as long as the number of new parking spaces does not exceed the number of previously existing parking spaces. Co

If your project is an existing site with parking, you can revamp the parking spaces (and even rearrange the layout) and still earn this credit as long as the number of new parking spaces does not exceed the number of previously existing parking spaces. Consider reducing the parking area, however, if it’s more than the project needs. This will help you comply with credits such as SSc6.1: Stormwater Management.

Do not include land-clearing debris or excavated soil in your calculations. Even if diverted from landfill, it is not to be included in the credit calculations. Contractors often think that trees and stumps are still part of the diverted waste, but take t

Do not include land-clearing debris or excavated soil or rock in your calculations. Even if diverted from landfill, it is not to be included in the credit calculations. Contractors often think that trees and stumps are still part of the diverted waste, but take them out of the LEED credit form and supporting documentation if the contractor includes them.