The architect and HVAC engineer should agree on the design, working with the cost estimator and owner.
The architect and HVAC engineer should agree on the design, working with the cost estimator and owner.
The architect and HVAC engineer should agree on the design, working with the cost estimator and owner.
Renovation and restoration projects are good candidates for deconstruction.
Typically, good materials to salvage via deconstruction include wood framing, steel columns and beams, hardwood flooring, multi-paned windows, architectural details, plumbing and electrical fixtures, hardware and cabinetry, and high-quality brick work.
Deconstruction is a good practice for maintaining a building material’s integrity so it can be reused. It certainly diverts waste from landfill and contributes to credit compliance as waste diversion.
Perform a site survey to decide whether deconstruction makes sense. This will depend on how the building was assembled and the value of the materials to be salvaged.
Deconstruction
Thinking long term, consider what design decisions can increase the likelihood of deconstruction further down the road when specifying materials and systems to be used in the current project. Material selection and assembly type can impact how materials may be deconstructed and reused at the end of the building’s life-cycle.
Deconstruction will add extra cost to the project due to the additional labor required to take materials apart, remove nails from wood, and maintain material integrity. Ideally, the contractor will find a buyer for the materials to help offset these costs.
If dealing with an existing building and a large amount of material is salvageable, consider deconstruction and materials salvage as an alternative to demolition. The contractor will have to oversee the process carefully. Many resources are available on deconstruction. (See Resources.)
The energy model itself will not account for any change in plug loads from the baseline case, even if your project is making a conscious effort to purchase Energy Star or other efficient equipment. Any improvement made in plug loads must be documented separately, using the exceptional calculation methodology (ECM), as described in ASHRAE 90.1-2007. These calculations determine the design case energy cost compared to the baseline case. They are included in the performance rating method (PRM) table or directly in the baseline and design case model.