A bus line that goes in separate directions (for example, one into town, one out of town), counts as a single bus line, not two, and does not meet the credit requirement for two bus lines. Compliant bus lines must serve two distinct routes. The simplest w

A bus line that goes in separate directions (for example, one into town, one out of town), counts as a single bus line, not two, and does not meet the credit requirement for two bus lines. Compliant bus lines must serve two distinct routes. The simplest way to determine this is to verify that the buses display two different route numbers. Two routes that converge near the project and then diverge blocks away count as separate.

Public, private, or campus bus lines in proximity to the project site can be used for credit compliance as long as building occupants have consistent access at peak times. If there is an existing shuttle that runs nearby to the project site with restricte

Public, private, or campus bus lines in proximity to the project site can be used for credit compliance as long as building occupants have consistent access at peak times. If there is an existing shuttle that runs nearby to the project site with restricted access, consider talking to bus operators to see if you can get permission for your project occupants to use the shuttle. (See the Documentation Toolkit for an example using a shuttle from the project site.)

You can also extrapolate purchasing data from other tenants to estimate purchase quantities for tenants who don’t provide data. However, all of those extrapolated purchases are assumed to be non-compliant for the purposes of LEED. That raises the percenta

You can also extrapolate purchasing data from other tenants to estimate purchase quantities for tenants who don’t provide data. However, all of those extrapolated purchases are assumed to be non-compliant for the purposes of LEED. That raises the percentage of purchases by participating tenants that must be compliant. (See example in the Documentation Toolkit.)

Identify the best space, either inside or outside the building, in which to locate bike racks. For projects with zero lot line and no site area, the bike racks will have to be located outside on the sidewalk or inside the building. Most of the time, the s

Identify the best space, either inside or outside the building, in which to locate bike racks. For projects with zero lot line and no site area, the bike racks will have to be located outside on the sidewalk or inside the building. Most of the time, the site’s parking area or garage is a suitable location for bike racks. Bike racks outside the building must be within 200 yards of the building entrance, either on the project site or on a public sidewalk.