100001987

Delete “Y” in the Exemplary Performance column for the following credits:

SLL Credit Preferred Locations
SLL Credit Restoration of Habitat or Wetlands and Water Bodies
NPD Credit Walkable Streets
NPD Credit Mixed-Use Neighborhoods
NPD Credit Housing Types and Affordability
NPD Credit Visitability and Universal Design
NPD Credit Local Food Production
NPD Credit Tree-Lined and Shaded Streetscapes
GIB Credit Historic Resource Preservation and Adaptive Reuse

100002010

Remove magnesium chloride, potassium chloride, and potassium acetate from the list of environmentally preferred deicers in the following locations:
SS Prerequisite Site Management Policy: Best Practices for Operational Elements, Table 1. Site management best practices
SS Prerequisite Site Management Policy: Example
SS Credit Site Management: Site Maintenance Activities for Operational Elements, Table 1. Snow and ice removal

100002013

Edit the guidance to read:
"Group Approach
All buildings in the group may be documented as one.
Campus Approach
Option 1: Eligible.
Option 2: Ineligible. Each LEED project may pursue the credit individually."

100002398

1. Delete the phrase "There are no substantive changes to prerequisite requirements;", capitalize the R in "Refer", and add the words "edits and" after the words "with the following".

2. Add new section "Behind the Intent:". Below the section header add the following text:
"Hydrochlorofluorocarbons (HCFCs) have shorter atmospheric lives than CFCs, but they still contribute to ozone depletion. Similar to CFCs, HCFCs have phase-out dates scheduled under the Montreal Protocol.

100002403

Step-by-Step Guidance

1. Case 3. Load Flexibility and Management Strategies - Step 1 Analyze building load shape: In the second sentence, delete "Use", capitalize the t in "The", and add the word "hourly" before "regional grid emissions data"

Further Explanation

100002405

Behind the Intent

1. In the second sentence that starts with "Renewable energy generation can...." replace the word "translates" with "contribute"

2. In the last sentence in the Behind the Intent section, replace "energy attribute certificates (EACs)" with the phrase "off-site renewable energy"

Beta Update

100002407

1. Delete the phrase "There are no substantive changes to the credit requirements;", capitalize the R in "refer to the LEED v4 reference guide", add "edits and" before the word "addition", and add an "s" to the end of the word "addition"