Post copies of the IAQ plan in various places around the construction site to ensure that the plan is being followed. Hang signs that remind subcontractors to follow IAQ practices such as covering exposed ductwork with plastic, wet mopping regularly, and

Post copies of the IAQ plan in various places around the construction site to ensure that the plan is being followed. Hang signs that remind subcontractors to follow IAQ practices such as covering exposed ductwork with plastic, wet mopping regularly, and using low-VOC products and other SMACNA practices. See the Documentation Toolkit for sample signage.

Develop a checklist for weekly activities that lists SMACNA guidelines and related to-do items, such as taking photographs to document the IAQ strategies. It’s a convenient way to stay on top of required tasks, and the checklist can be used at weekly meet

Develop a checklist for weekly activities that lists SMACNA guidelines, protection of absorptive material, and use of MERV 8 filters along with related to-do items, such as taking photographs to document the IAQ strategies. It’s a convenient way to stay on top of required tasks, and the checklist can be used at weekly meetings and posted around the site. See the Documentation Toolkit for a sample checklist.

The GC distributes the Indoor Air Quality plan outlining procedures and best practices to be distributed to subcontractors prior to the construction phase. The plan should clearly identify who is responsible for implementing each component of the plan—for

The GC distributes the Indoor Air Quality plan outlining procedures and best practices to be distributed to subcontractors prior to the construction phase. The plan should clearly identify who is responsible for implementing each component of the plan—for example, “Wrapping installed open-ended HVAC ductwork is the responsibility of the mechanical contractor,” and “Quality control is the responsibility of the general contractor.”