Carefully examine the sequencing of material installation before construction begins.  Schedule installation to protect absorptive materials from construction pollution. For example, do not store or install acoustic ceiling tiles before painting occu

Carefully examine the sequencing of material installation before construction begins.  Schedule installation to protect absorptive materials from construction pollution. For example, do not store or install acoustic ceiling tiles before painting occurs or flooring products are installed because the ceiling tiles will absorb the off-gassing paint or floor adhesives and will contaminate the air over a longer time period. This could also compromise the project’s ability to attain IEQc3.2: Construction IAQ Management Plan—Before Occupancy. 

Follow SMACNA strategies for pathway interruption that are appropriate to your project. These include items such as the following:Temporary barriers and self-contained dustless apparatus, such as concrete grinders and drywall sanders, can be helpful to is

Follow SMACNA strategies for pathway interruption that are appropriate to your project. These include items such as the following:

Temporary barriers and self-contained dustless apparatus, such as concrete grinders and drywall sanders, can be helpful to isolate and protect finished construction areas from areas that are still under construction. Isolate construction dust produced by activities like cutting drywall or wood. 
Separate construction zones from occupied zones.