Check to see if the school already has a joint-use agreement with local organizations. Even if current arrangements don’t meet LEED requirements, they may already be halfway there; existing arrangements may simply need to be formalized. 

Check to see if the school already has a joint-use agreement with local organizations such as scouting groups, civic or church groups, neighborhood associations, family services, and various community groups. Even if current arrangements don’t meet LEED requirements, they may already be halfway there; existing arrangements may simply need to be formalized.

Schedule the application of adhesives and sealants so that offgassing does not contaminate other absorptive materials. This is required if projects are attempting IEQc3.1: Construction Indoor Air Quality Plan—During Construction. For example, do not store

Schedule the application of adhesives and sealants so that offgassing does not contaminate other absorptive materials. This is required if projects are attempting IEQc3.1: Construction Indoor Air Quality Plan—During Construction. For example, do not store or install acoustic ceiling tile before flooring and wall adhesives are put down, because ceiling tiles will absorb the off-gassing of paint and floor adhesives and contaminate the air over a longer time period.

Only a random 20% sampling of product cut sheets need to be uploaded to LEED Online to document this credit.

Product cut sheets do not need to be uploaded to LEED Online to document this credit, however it is best to keep all of these until the project is certified. There is a chance that this credit could be audited and you may need to provide proof of all products.