100001994

Under the second paragraph, last sentence, change the reuse value for Building A from "71.6%" to "70.9%" to reflect the value in Table 1.

100002219 - Europe ACP Reduced Parking Footprint

International Tips section added to provide supporting guidance for the Europe ACP:

"Preferred Parking for Carpools and Shared-Use Vehicles
For European projects pursuing Case 2, provide preferred parking for carpool or shared-use vehicles for 5% of the total parking spaces after reductions are made from the base ratios. Preferred parking is not required if no off-street parking is provided.

100002451

Option 3
1.Change title 'Multi-attribute Assessment of Products' to 'Building Product Disclosure and Optimization'
2. Remove the line "in which the manufacturer is explicitly recognized as the participant by the program operator" for Product specific Type III EPD
3. Remove 'USGBC approved program – Products that comply with other USGBC approved environmental product declaration frameworks.'

100002444

Delete the Construction and Demolition Waste Management Planning prerequisite and associated beta guidance in both BD+C and ID+C

100002428

In the bulleted list of credits and prequisites under the first paragraph, remove "(Option 1 only)" from the fourth bullet after EQp Green Cleaning Policy

100002470

Update and replace description under Beta Update as follows:
The requirement for diversion via multiple material streams in LEED has been removed. Project teams now have more flexible ways to prevent and divert waste in order to earn points. This new structure rewards the hierarchy of first reduce, reuse, and then recycle.

100002469

Update and replace description under Beta Update as follows:
The requirement for diversion via multiple material streams in LEED has been removed. Project teams now have more flexible ways to prevent and divert waste in order to earn points. This new structure rewards the hierarchy of first reduce, reuse, and then recycle.

100002471

Delete the first line under Guidance and replace with the following:

“This credit has new thresholds and requirements. The following sections replace the guidance in the LEED v4 Reference Guide”.