Before deciding which compliance path to follow, consider the age and condition of your base building system. It may make more sense to develop a phase-out plan for CFC-based refrigerants in equipment that has nearly reached the end of its useful life. Al

Before deciding which compliance path to follow, consider the age and condition of your base building system. It may make more sense to develop a phase-out plan for CFC-based refrigerants in equipment that has nearly reached the end of its useful life. Alternatively, if you have newer CFC-containing equipment that is still performing very well, it may be better to perform the economic feasibility analysis to determine the payback period for retrofitting your equipment.

Upload to LEED Online a copy of the building’s ongoing commissioning plan, along with documentation summarizing the overall commissioning cycle of the building. Include a building equipment list outlining the performance measurement frequency and procedur

Upload to LEED Online a copy of the building’s ongoing commissioning plan, along with documentation summarizing the overall commissioning cycle of the building. Include a building equipment list outlining the performance measurement frequency and procedures for responding to deviations from expected performance. Also include a budget for the overall commissioning cycle and costs for the completion of each major commissioning task within the cycle.

The commissioning plan and budget should include substantial detail, particularly around system testing and performance verification. LEED reviewers will be looking for clear evidence that functional tests are well-defined for major systems and that the c

The commissioning plan and budget should include substantial detail, particularly around system testing and performance verification. LEED reviewers will be looking for clear evidence that functional tests are well-defined for major systems and that the commissioning tasks and monitoring mechanisms rise above standard preventive maintenance and BAS-based monitoring actions.