ASHRAE 62.1 recognizes two procedures to prove IAQ compliance: the IAQ Procedure methodology and the Ventilation Rate Procedure. The Ventilation Rate Procedure is easier to apply and is the prescribed path for this LEED prerequisite.

ASHRAE 62.1 recognizes two procedures to prove IAQ compliance: the IAQ Procedure methodology and the Ventilation Rate Procedure. The Ventilation Rate Procedure is easier to apply and is the prescribed path for this LEED prerequisite. Documentation using the IAQ Procedure requires the quantification of contaminant source emissions rates and their reduction, and has historically not been accepted for this prerequisite because it is performance-based and difficult to compare across projects.

Natural ventilation strategies can reduce costs. Natural ventilation in particular can reduce the need for mechanical equipment as well as operational costs. Displacement ventilation, in which air is delivered at or near floor level at a low velocity, can

Natural ventilation strategies can reduce costs. Natural ventilation in particular can reduce the need for mechanical equipment as well as operational costs. Displacement ventilation, in which air is delivered at or near floor level at a low velocity, can also reduce ducting and improve equipment efficiency. In choosing a system, analyze life cycle cost tradeoffs.