Skip to main content

You are currently logged in under an enterprise account

Before making a purchase, you'll need to login to your personal profile or create one now.

Home
Go to BuildingGreen.com
  • Go to BuildingGreen.com
Top navigation
  • About
  • CEUs
  • Exam Prep
  • Reports
  • FAQ
  • Pricing
  • Support
Menu user
  • Login
Home
Main navigation
  • LEED Credits
  • Forum
  • Blog
  • Tip sheets

Firm or campus member?

Please log in using your personal profile:
Log in »   Create personal profile »
You’re Already Subscribed

You're already enjoying full Premium access. No need to subscribe again.

Option 3 – Measure Site Perimeter Illumination

Submitted by on
  • Read more about Option 3 – Measure Site Perimeter Illumination

Option 3 – Measure Site Perimeter Illumination

A preventative maintenance program will likely involve no or low costs.

Submitted by on
  • Read more about A preventative maintenance program will likely involve no or low costs.

A preventative maintenance program will likely involve no or low costs.

Use manual or automatic controls to turn off exterior lighting during late-night hours when reduced lighting will not create a safety risk.

Submitted by on
  • Read more about Use manual or automatic controls to turn off exterior lighting during late-night hours when reduced lighting will not create a safety risk.

As a best practice, use manual or automatic controls to turn off exterior lighting during late-night hours when reduced lighting will not create a safety risk.

Adhere to a preventative maintenance program to regularly inspect exterior lamps, fixtures, and shielding to ensure minimal levels of light pollution.

Submitted by on
  • Read more about Adhere to a preventative maintenance program to regularly inspect exterior lamps, fixtures, and shielding to ensure minimal levels of light pollution.

Adhere to a preventative maintenance program to regularly inspect exterior lamps, fixtures, and shielding to ensure minimal levels of light pollution.

Option 2 – Exterior Fixture Shielding

Submitted by on
  • Read more about Option 2 – Exterior Fixture Shielding

Option 2 – Exterior Fixture Shielding

No action is needed during the performance period for compliance with this option.

Submitted by on
  • Read more about No action is needed during the performance period for compliance with this option.

No action is needed during the performance period for compliance with this option.

Option 1 – Prior LEED Certification

Submitted by on
  • Read more about Option 1 – Prior LEED Certification

Option 1 – Prior LEED Certification

Exterior Lighting Systems

Submitted by on
  • Read more about Exterior Lighting Systems

Exterior Lighting Systems

Compliance for this option is low-to-no cost.

Submitted by on
  • Read more about Compliance for this option is low-to-no cost.

Compliance for this option is low-to-no cost.

Work with custodial staff to ensure that control systems are reactivated appropriately following an override situation.

Submitted by on
  • Read more about Work with custodial staff to ensure that control systems are reactivated appropriately following an override situation.

Work with custodial staff to ensure that control systems are reactivated appropriately following an override situation.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 642
  • Page 643
  • Page 644
  • Page 645
  • Current page 646
  • Page 647
  • Page 648
  • Page 649
  • Page 650
  • …
  • Next page Next ›
  • Last page Last »
Subscribe to
logo-footer
Footer
  • Contact us
  • BuildingGreen
  • Jobs at BuildingGreen
  • Terms & Conditions
  • Privacy Policy

© 2026 BuildingGreen, Inc. All rights reserved except where noted.

Reseau Sociaux