ad-100000229

In the third line of the third paragraph, replace "WE Credit 4, Option 2, Nonpotable Water Source Use" with "WE Credit 4.2 Cooling Tower Water Management - Nonpotable Water Source Use"

ad-100000228

In the first line of the third paragraph, replace "WE Credit 4, Option 1, Chemical Management" with "WE Credit 4.1 Cooling Tower Water Management - Chemical Management"

ad-100000227

In the last line of the first paragraph, replace "WE Credit 4, Option 2, Nonpotable Water Source Use" with "WE Credit 4.2 Cooling Tower Water Management - Nonpotable Water Source Use"

ad-100000205

In the fourth bulleted item, replace the text "WE Credit 4: Cooling Tower Water Management" with "WE Credit 4.1: Cooling Tower Water Management - Chemical Management" and, below as a new line, "WE Credit 4.2: Cooling Tower Water Management - Nonpotable Water Source Use"

ad-100000235

In the tenth line of the first paragraph, replace both instances of "25 MBtus" with "12.5 MBtus" so it becomes "...performance period is 12.5 MBtus for electricity and 12.5 MBtus for natural gas"

ad-100000232

In header, remove the text "(maximum 2 points)" and replace with "(EAp2 compliance option)" so the text becomes "CASE 2, OPTION 2A: Streamlined Baseline (EAp2 compliance option)"