ad-100000446

Insert the term "Extraction, harvest or recovery point" in alphabetical order with the accompanying text "Extraction, harvest or recovery point refers to the location of raw materials prior to manufacturing of the building material or product that is furnished and installed in the project building."

ad-100000445

Replace the text with "Breathing zone is the region within an occupiedspace between 3 and 6 feet above the floor. Note that this definitionvaries from that of ASHRAE 62.1-2007, which states that the breathingzone is between 3 inches and 6 feet from the floor, and 2 feet from thewalls as well as fixed air conditioning equipment."

ad-100000444

Insert the term "Bay" in alphabetical order with the accompanying text "A bay is a component of a standard, rectilinear building design. It is the open area defined by a building element such as columns or a window. Typically, there are multiple identical bays in succession."

ad-100000443

Insert the following section:Path 3. Pilot Credit (1 point)Attempt a pilot credit available in the Pilot Credit Library atwww.usgbc.org/pilotcreditlibrary. Register as a pilot credit participant andcomplete the required documentation. Projects may pursue more than 1pilot credit; however, a maximum of 1 point will be awarded.