100001848
Step 4. Evaluate Compliance and Make Adjustments if Necessary- delete text at beginning of second paragraph ‘ASHRAE 62.1–2010, Section 6.5.’
Step 4. Evaluate Compliance and Make Adjustments if Necessary- delete text at beginning of second paragraph ‘ASHRAE 62.1–2010, Section 6.5.’
Change credit name ‘MR Prerequisite Facility Alterations and Additional Policy’ to ‘MR Prerequisite Facility Maintenance and Renovation Policy’.
Remove "seawater" from list of untreated water sources ineligible for this credit.
Add "treated seawater" to the list of acceptable alternative water sources, behind stormwater.
Step 1-add text: Additionally, include in the credit calculations all plumbing fixtures necessary to meet the occupants’ needs whether they will be installed as part of the project’s scope of work or not. Include at a minimum all necessary restroom fixtures (toilets, urinals, and lavatories) to meet the project occupants’ needs, and showers when seeking LT Credit Bicycle Facilities. The WaterSense label requirement does not apply to fixtures that are outside of the scope of the LEED project.
Under Option 2, Performance, modify the second sentence so it reads "Confirm that the building or contractor was audited by the third party within 12 months of the performance period."
Under 5th bullet, for the impact category formation of tropospheric ozone add unit is measure "kg O3 eq" to reflect TRACI version 2.1 so the sentence reads "formation of tropospheric ozone, in kg NOx, kg O3 eq, or kg ethene; and..."
Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements" with: "Project outside the U.S. must meet WaterSense flush and flow rates."
Revise all references to the online "Innovation database" to say "Innovation Catalog."
Revise Group Approach to: Eligible. All buildings in the group may be documented as one.
Under Step 2, delete the last sentence of first bullet (delete: Consider the required measurement schedule: the second measurement must be taken at least five months after the first.).