100001848

Step 4. Evaluate Compliance and Make Adjustments if Necessary- delete text at beginning of second paragraph ‘ASHRAE 62.1–2010, Section 6.5.’

100001843

Change credit name ‘MR Prerequisite Facility Alterations and Additional Policy’ to ‘MR Prerequisite Facility Maintenance and Renovation Policy’.

100001831

Remove "seawater" from list of untreated water sources ineligible for this credit.
Add "treated seawater" to the list of acceptable alternative water sources, behind stormwater.

100001832

Step 1-add text: Additionally, include in the credit calculations all plumbing fixtures necessary to meet the occupants’ needs whether they will be installed as part of the project’s scope of work or not. Include at a minimum all necessary restroom fixtures (toilets, urinals, and lavatories) to meet the project occupants’ needs, and showers when seeking LT Credit Bicycle Facilities. The WaterSense label requirement does not apply to fixtures that are outside of the scope of the LEED project.

100001847

Under Option 2, Performance, modify the second sentence so it reads "Confirm that the building or contractor was audited by the third party within 12 months of the performance period."

100001833

Under 5th bullet, for the impact category formation of tropospheric ozone add unit is measure "kg O3 eq" to reflect TRACI version 2.1 so the sentence reads "formation of tropospheric ozone, in kg NOx, kg O3 eq, or kg ethene; and..."

100001914

Replace "Projects in unlisted countries must comply with the 20%-below-baseline requirement but have no additional performance requirements" with: "Project outside the U.S. must meet WaterSense flush and flow rates."