ad-100000350

In the first line of the first paragraph, replace the first sentence with "An office building in Austin, Texas, has 6,000 square feet of landscape area."

ad-100000646

"Air sealing and painting are inexpensive. The exhaust fan should be moderate cost." change to "Air sealing is inexpensive. Installing an exhaust fan should be a moderate cost."

ad-100000194

In this third paragraph of the page, replace the text so it becomes the following:Licensed Professional Exemption. Licensed Professional Exemptions(LPEs) can be used by a project team\'s registered professional engineer,registered architect, registered interior designer, or registered landscapearchitect as a streamlined path for documenting certain credits, orbypassing otherwise-required submittals. License information and anExemption Signature in LEED Online are required to document eachexemption the project team wishes to claim.

ad-100000147

In first line of the paragraph insert a comma after "particulates" and in the second line remove the period after "pollutants" so the text becomes "...hazardous particulates, biological contaminants and chemical pollutants that degrade..."

ad-100000369

In the second paragraph, remove the text:The energy intensity multiplied by the square footage of the projectrepresents the total amount of green power (in kWh) that wouldneed to be purchased over a 2-year period to qualify for EA Credit6 using this option."Replace with "The energy intensity multiplied by the square footageof the project represents the total amount of electricityconsumption. Total electricity consumption X 35% X 2 yearsrepresents the total green power (kWh) that would need to bepurchased over a 2-year period to qualify for EA Credit 6 using thisoption.