ad-100001175

Under CASE 2, replace language in its entirety with Options 1 and 2 from BD+C EA Credit 5: Measurement and Verification: "Option 1Develop and implement a measurement and verification (M&V) plan consistent with Option D: Calibrated Simulation (Savings Estimation Method 2) as specified in the International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003.The M&V period must cover at least 1 year of post-construction occupancy.Provide a process for corrective action if the re

ad-100001174

Add the following at the end of the requirements:"OR (1 point)Meet MPR 6 through compliance with Opttion1: Energy and Water Data Release Form. Projects must register an account in ENERGY STAR\'s Portfolio Manager tool and share the project file with the USGBC master account."

ad-100000650

changed from "Ponds can be counted as open space if theyborder a walking or bicycle path" to "Areas around ponds can be counted as open space if theyhave usable, accessible recreational space such as walking or bicycle paths."

ad-100000266

In the first paragraph, remove the text "Design natural ventilation systems for occupied spaces to meet the recommendations set forth in the Carbon Trust "Good Practice Guide 237" (1998)."

ad-100000658

the Example Notice to Wood Products Suppliers should read: "Notice toVendors: [The company] prefers to purchase wood products that are certified according to theguidelines of the Forest Stewardship Council (FSC). [The company] also prefers not to use anytropical wood or wood products. If any tropical wood or wood products are supplied, they mustbe FSC certified. Please provide the country of manufacture of each product you expect to supplyto us. Also please provide a list of FSC-certified products you can supply."

ad-100000657

the Low-Emissions requirement should be changed from "Hard flooring: additional 1/2 point for 100% hard surface flooring" to"Hard flooring automatic: 1/2 point for 90% hard surface flooring"