How do I account for computers with multiple monitors on Portfolio Manager?

The number of monitors in the building does not impact the number of computers entered into Portfolio Manager. The value for computers should reflect the total number of personal computers and servers in the office space. For example, if the office space includes 10 PCs, 5 laptops, and 25 monitors, the input for Portfolio Manager is 15 PCs.

If you pursue the streamlined path for an Energy Star label, should the performance period for EAc6 match the 12-month time frame of the label?

For EAc6, the performance period should fall within 30 days of the latest performance period end date for all other credits and prerequisites. It should not follow the period of the Energy Star label associated with the streamlined path for EAp2.

What do I do if the number of building occupants, operating hours, or vacant space changes during the performance period?

When applicable variables change during the performance period, these changes must be recorded on Portfolio Manager to ensure accurate benchmarking of the building. When making updates to the space characteristics on Portfolio Manager, make sure to select “update” rather than “correct” and note the date when the updated space characteristic was first true. By selecting “update” the change in the building characteristic is only counted for the appropriate portion of the performance period rather than the whole thing.

We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

For the LEED submission, provide a summary of submetered energy use for the project building along with the utility bills for the campus. Include a narrative summarizing the sub-metering approach and explaining the difference between the utility bills and the submetered energy use data included on Portfolio Manager, which commonly includes a spreadsheet showing the deductions from the total consumption used to show the energy attributable to the project, or how submeter readings for each separate entity add up to the whole reflected in the utility bills.

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

Process loads generally may not be excluded from the building’s energy use for benchmarking purposes. However, depending on the appropriate compliance path, you may be able to normalize the energy use from process loads based on the relative activity level of the building operations. For example, if the building is a manufacturing facility, part of the benchmarking process will involve normalizing energy use based on the relative output of the facility. Use of CIRs in the case of special benchmarking for buildings with process loads is recommended.

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

In order to use an Energy Star label for the streamlined path, the Label must have been awarded within 12 months of the LEED application submittal date. For example, if you receive label award notification from Energy Star on March 5, 2012, you can use the score associated with the label as long as you submit your application to GBCI on or before March 5, 2013.

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

In this case it is a good idea to (1) reach out to Energy Star directly to determine if the structures should be benchmarked as a single building or two and then (2) reference the LEED Supplemental Guidance to the Minimum Program Requirements. If it is still unclear after those two steps are taken, it’s also a good idea to communicate with USGBC directly to confirm the best approach.

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

The first step is to enter the building and associated space characteristics on Portfolio Manager to see if the building is eligible for an Energy Star rating. If it is, you go with Case 1 and if not, go to the Case 2 calculator. Energy Star has published additional guidance for mixed-use buildings that is a great resource in this circumstance.