Phase I Environmental Site Assessment (ESA)
Waste Stream Audit Report
Food Purchases Tracking Sheet
Commissioning or Auditing RFP
Ongoing Commissioning RFP
Product Cut Sheets
Look to product cut sheets for information on the certifications and VOC content of flooring and adhesives or coatings associated with flooring. The example here of a tile clearly states that it is FloorScore-certified, but the VOC level for the tile adhesive is not given, and will need to be requested from the manufacturer.
IAQ Photo Documentation
All five SMACNA control measures have to be documented in a photo log. It is easy to take pictures of covered ducts, but don’t forget to also take photos of more process-oriented strategies such as housekeeping and pathway interruption. The pictures should clearly show all the control measures adopted during construction. Photos should be submitted with a brief description, the time and date, and an indication of what SMACNA practice is demonstrated.
Weekly IAQ Checklist
A checklist like this can be used at regular meetings between the GC and subcontractors to ensure that IAQ management plan measures are being followed.
Construction IAQ Management Plan
The Indoor Air Quality Management Plan outlines procedures and best practices covering all five areas of SMACNA guidelines. Shown here is a template formatted with the sections the IAQ plan should cover and giving guidance on how to customize the template to develop your own IAQ plan. Also shown here is a sample IAQ plan from a Harvard University project.