Floor Plan & Elevation

To document this credit you'll need a floor plan and elevation identifyng the structural components that are retained and those that are demolished. It verifies the accuracy of elements included in the building reuse calculations.

Entryway Systems

A floor plan like this project example is required to document the presence of entryway track-off systems, length and location. Note that this sample shows six-foot entryway systems because the project predated LEED 2009. For LEED 2009, the systems need to be ten feet in length.

Tariff Charges

Option 1 calculates savings in annual energy cost, but utility prices may vary over the course of a year. This sample demonstrates how to document varying electricity tariffs.