Entryway Systems
A floor plan like this project example is required to document the presence of entryway track-off systems, length and location.
A floor plan like this project example is required to document the presence of entryway track-off systems, length and location.
Prepared by the design team, the BOD explains through narrative and documentation how the proposed design meets the OPR.
These examples of SSc4.2 documentation show FTE calculations and a credit-compliant site plan with bike racks.
Use this form to track your carpet systems' compliance with the credit requirements.
Use this form to track your concrete mixes and their recycled content and distance to the manufacturing and extraction sites.
Use a tracking sheet and calculator like this one to monitor your credit compliance.
Use a letter like this sample to orient the contractor to their responsibilities for all MR and IEQ credits. This letter is an introduction that can be customized for the credits your project is pursuing.
This credit is a Design-phase submittal, so you have the option of submitting it for review after design is complete.